My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. EDSR 10-19-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
10-19-2020
>
7.1. EDSR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2020 10:06:33 AM
Creation date
10/16/2020 9:35:12 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'L <br /> the milligan studio <br /> G. ESTIMATED BUDGET <br /> ARTIST FEE <br /> Two artists for all labor costs including design,documentation,fabrication and community engagement events. <br /> TOTAL: $20,000 <br /> PROJECT MANAGEMENT AND SUPPORT: <br /> Coordination of sculpture build,social media,press management including documentation,which take the form of <br /> photographs and narratives posted on websites,instragram accounts,and facebook pages so that stakeholders can watch <br /> the progress of the build.A published art book highlighting the process and finished work is also an option,at an <br /> additional charge for printing.These high quality art books can be sold as a fundraiser,or used as documentation for <br /> granting or educational purpouses.For more about this,ask to see the School of(Fish)book. <br /> Also included in our projects is the participation of the artists in community engagement events,which are determined <br /> by the scope of the project and identifiable community needs.These are often promotional events,but can also include <br /> educational workshops presented in community venues. <br /> On this project,we suggest a glass kilnforming workshop under tents at the site,or a Bronze Age metal casting.These <br /> opportunities enable community members to understand the fabrication techniques behind the work and engender a <br /> sense of ownership.Materials for these worksops are minimal. <br /> PROJECT MANAGEMENT AND SUPPORT ARE INCLUDED IN THE ARTIST FEE. <br /> PUBLIC ART MATERIALS <br /> Architectural-grade kiln forming recycled glass $3,500 <br /> Glass attachment findings $400 <br /> 20 Stainless Steel tubel 1/2 @10'@$200 $2,100 <br /> (including delivery to studio) <br /> Three (3)bronze sheet 4'x10' $4,000 <br /> Stainless Steel baseplate lasercut 1 '/z"M $1,100 <br /> Welding and supplies chargeback $1,610 <br /> Fixings/threaded bar $220 <br /> Patination chemicals and supplies $300 <br /> MATERIALS ESTIMATE TOTAL: $13,230 <br /> FABRICATION <br /> Fabrication of curved steel bars(Linder's) $4,300 <br /> 3 weeks @ 40 hours for one general assistant($20) $2,400 <br /> Firing of glass triangles $330 <br /> Insurance coverage $200 <br /> FABRICATION SUB TOTAL: $7,230 <br /> SOLAR LIGHTING BUDGET <br /> Bespoke solar lighting system through local Elk River vendor <br /> Architectural Grade <br /> LED RGBW Directional Uptight Approximately$3,000 <br /> TRANSPORTATION COSTS <br /> Truck rental with lift gate$383(including mileage) <br /> INSTALLATION COSTS <br /> It's usually good practice to have the City help with the install,as they are to insure the work once they take possession.If <br /> the City/commissioners lay the concrete pad according to local code and help set the work in place,then they can <br />
The URL can be used to link to this page
Your browser does not support the video tag.