MECONSTRUCTION <br />21025 Commerce Blvd., Suite 1000 <br />Rogers, MN 55374 <br />Elk River Public Safety Building Expansion <br />Bid Opening: October 13, 2020 <br />LOW BID SUMMARY <br />BID CATEGORY <br />LOW BIDS <br />RECEIVED <br />PREVIOUS <br />ESTIMATE <br />HIGH BIDS <br />RECEIVED <br />APPARENT LOW BIDDERS <br /># of Bids <br />NOTES <br />Genl Reqmts, Permits, Bonds, Ins, Personnel, Precon <br />$1,006,485 <br />$1,006,485 <br />$1,006,485 <br />BC#2A- Selective Demolition <br />$131,369 <br />$125,196 <br />$284,800 <br />Envirobate <br />7 <br />BC#3A-Concrete <br />$413,200 <br />$571,908 <br />$815,000 <br />Ebert Construction <br />8 <br />BC#3B - Precast Concrete <br />$278,526 <br />$300,800 <br />$405,447 <br />Huffcut <br />4 <br />BC#3C - Polished Concrete <br />$12,360 <br />$7,092 <br />$19,150 <br />Concrete Treatments <br />5 <br />The low bidder (Surface Pros) had an error and withdrew their bid <br />BC#4A- Masonry <br />$370,900 <br />$788,389 <br />$556,950 <br />B&D Associates <br />8 <br />BC#5A- Steel Supply <br />$154,950 <br />$138,314 <br />$219,630 <br />Ben's Structural Fabrication <br />4 <br />BC#5B-Steel Install <br />$41,150 <br />$74,000 <br />$90,115 <br />Patriot Erectors <br />7 <br />BC#6A-Carpentry <br />$152,000 <br />$122,046 <br />$257,000 <br />Century Construction <br />5 <br />BC#6B - Casework <br />$79,886 <br />$129,560 <br />$79,886 <br />Terra will Re -Bid This Category <br />1 <br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes <br />BC#7A- Roofing <br />$236,246 <br />$343,960 <br />$384,600 <br />John A. Dalsin <br />12 <br />BC#7B - Metal Wall Panels <br />$17,881 <br />$27,060 <br />$37,640 <br />Lake Area Roofing <br />5 <br />BC#7C- Fluid Applied Air Barrier <br />$14,696 <br />$27,600 <br />$27,818 <br />Structural Applicators <br />3 <br />BC#7D-Joint Sealants <br />$39,684 <br />$25,200 <br />$84,195 <br />WCSI1 <br />5 <br />BC#8A- Doors, Frames & Hardware (Material Only) <br />$86,245 <br />$84,531 <br />$87,437 <br />Mid -Central Doors <br />2 <br />BC#8B - Sectional Doors <br />$78,800 <br />$77,572 <br />$81,970 <br />Crawford Doors <br />3 <br />The low bidder (Star Equipment) had an enor and withdrew their bid <br />BC#8C- Glass &Glazing <br />$67,934 <br />$163,805 <br />$128,643 <br />Heartland Glass <br />3 <br />BC#9A- Gypsum Board <br />$196,000 <br />$172,102 <br />$233,500 <br />Duality Drywall <br />3 <br />BC#9B - Tile <br />$46,411 <br />$54,830 <br />$59,995 <br />Mid -State Tile <br />4 <br />BC#9C- Acoustical Ceilings <br />$34,700 <br />$69,359 <br />$63,530 <br />Twin City Acoustics <br />5 <br />BC#9D - Carpet & Resilient <br />$50,130 <br />$40,365 <br />$50,130 <br />Terra will Re -Bid This Category <br />1 <br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes <br />BC#9E - Resinous Flooring <br />$98,912 <br />$54,096 <br />$136,240 <br />Surface Pro's <br />5 <br />BC#9F - Painting & Wallcovering <br />$106,209 <br />$85,573 <br />$117,930 <br />Virnig Painting <br />3 <br />BC#21A-Fire Suppression <br />$52,300 <br />$57,454 <br />$90,345 <br />Summit Fire Protection <br />4 <br />BC#22A-Mechanical <br />$1,031,840 <br />$1,271,000 <br />$1,380,000 <br />Precise Heating <br />11 <br />BC#26A-Electrical <br />$352,235 <br />$692,000 <br />$524,500 <br />Klein Electric <br />5 <br />BC#31A-Earthwork <br />$177,400 <br />$258,886 <br />$483,250 <br />New Look Contracting <br />11 <br />BC#32A- Fencing <br />$120,375 <br />$26,320 <br />$120,375 <br />Terra will Re -Bid This Category <br />1 <br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes <br />BC#32B-Landscaping <br />$42,980 <br />$33,000 <br />$90,000 <br />Autumn Ridge Landscaping <br />3 <br />BC#32C-Asphalt Paving <br />$144,740 <br />$158,180 <br />$176,740 <br />Bituminous Roadways <br />4 <br />BC#32D - Curb, Gutter & Sidewalks <br />$78,700 <br />$105,706 <br />$95,200 <br />Ebert Construction <br />4 <br />BC#33A- Site Utilities <br />$84,000 <br />$107,210 <br />$117,262 <br />St. Paul Utilities <br />5 <br />Potential Savings/Tax Exempt <br />n/a <br />($157,000) <br />n/a <br />SUB -TOTAL <br />$5,799,244 <br />$7,042,599 <br />$8,305,763 <br />151 Total Bids <br />Add Alternate #1- Basement EOC Room <br />$10,340 <br />Add Alternate #4- High Speed Doors <br />$46,000 <br />Sub -Total with Alternates <br />$5,855,584 <br />$7,042,599 <br />$8,305,763 <br />Project Fee <br />$90,762 <br />$109,160 <br />$128,739 <br />CMs Contingency <br />$234,223 <br />$281,704 <br />$332,231 <br />TOTAL With Add Alternates #1 &#4) <br />$6,180,569 <br />$7,433,463 <br />$8,766,733 <br />Add Alternate #3- RTU Rsplacement(Separate Budget) $103,885 <br />