MECONSTRUCTION
<br />21025 Commerce Blvd., Suite 1000
<br />Rogers, MN 55374
<br />Elk River Public Safety Building Expansion
<br />Bid Opening: October 13, 2020
<br />LOW BID SUMMARY
<br />BID CATEGORY
<br />LOW BIDS
<br />RECEIVED
<br />PREVIOUS
<br />ESTIMATE
<br />HIGH BIDS
<br />RECEIVED
<br />APPARENT LOW BIDDERS
<br /># of Bids
<br />NOTES
<br />Genl Reqmts, Permits, Bonds, Ins, Personnel, Precon
<br />$1,006,485
<br />$1,006,485
<br />$1,006,485
<br />BC#2A- Selective Demolition
<br />$131,369
<br />$125,196
<br />$284,800
<br />Envirobate
<br />7
<br />BC#3A-Concrete
<br />$413,200
<br />$571,908
<br />$815,000
<br />Ebert Construction
<br />8
<br />BC#3B - Precast Concrete
<br />$278,526
<br />$300,800
<br />$405,447
<br />Huffcut
<br />4
<br />BC#3C - Polished Concrete
<br />$12,360
<br />$7,092
<br />$19,150
<br />Concrete Treatments
<br />5
<br />The low bidder (Surface Pros) had an error and withdrew their bid
<br />BC#4A- Masonry
<br />$370,900
<br />$788,389
<br />$556,950
<br />B&D Associates
<br />8
<br />BC#5A- Steel Supply
<br />$154,950
<br />$138,314
<br />$219,630
<br />Ben's Structural Fabrication
<br />4
<br />BC#5B-Steel Install
<br />$41,150
<br />$74,000
<br />$90,115
<br />Patriot Erectors
<br />7
<br />BC#6A-Carpentry
<br />$152,000
<br />$122,046
<br />$257,000
<br />Century Construction
<br />5
<br />BC#6B - Casework
<br />$79,886
<br />$129,560
<br />$79,886
<br />Terra will Re -Bid This Category
<br />1
<br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes
<br />BC#7A- Roofing
<br />$236,246
<br />$343,960
<br />$384,600
<br />John A. Dalsin
<br />12
<br />BC#7B - Metal Wall Panels
<br />$17,881
<br />$27,060
<br />$37,640
<br />Lake Area Roofing
<br />5
<br />BC#7C- Fluid Applied Air Barrier
<br />$14,696
<br />$27,600
<br />$27,818
<br />Structural Applicators
<br />3
<br />BC#7D-Joint Sealants
<br />$39,684
<br />$25,200
<br />$84,195
<br />WCSI1
<br />5
<br />BC#8A- Doors, Frames & Hardware (Material Only)
<br />$86,245
<br />$84,531
<br />$87,437
<br />Mid -Central Doors
<br />2
<br />BC#8B - Sectional Doors
<br />$78,800
<br />$77,572
<br />$81,970
<br />Crawford Doors
<br />3
<br />The low bidder (Star Equipment) had an enor and withdrew their bid
<br />BC#8C- Glass &Glazing
<br />$67,934
<br />$163,805
<br />$128,643
<br />Heartland Glass
<br />3
<br />BC#9A- Gypsum Board
<br />$196,000
<br />$172,102
<br />$233,500
<br />Duality Drywall
<br />3
<br />BC#9B - Tile
<br />$46,411
<br />$54,830
<br />$59,995
<br />Mid -State Tile
<br />4
<br />BC#9C- Acoustical Ceilings
<br />$34,700
<br />$69,359
<br />$63,530
<br />Twin City Acoustics
<br />5
<br />BC#9D - Carpet & Resilient
<br />$50,130
<br />$40,365
<br />$50,130
<br />Terra will Re -Bid This Category
<br />1
<br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes
<br />BC#9E - Resinous Flooring
<br />$98,912
<br />$54,096
<br />$136,240
<br />Surface Pro's
<br />5
<br />BC#9F - Painting & Wallcovering
<br />$106,209
<br />$85,573
<br />$117,930
<br />Virnig Painting
<br />3
<br />BC#21A-Fire Suppression
<br />$52,300
<br />$57,454
<br />$90,345
<br />Summit Fire Protection
<br />4
<br />BC#22A-Mechanical
<br />$1,031,840
<br />$1,271,000
<br />$1,380,000
<br />Precise Heating
<br />11
<br />BC#26A-Electrical
<br />$352,235
<br />$692,000
<br />$524,500
<br />Klein Electric
<br />5
<br />BC#31A-Earthwork
<br />$177,400
<br />$258,886
<br />$483,250
<br />New Look Contracting
<br />11
<br />BC#32A- Fencing
<br />$120,375
<br />$26,320
<br />$120,375
<br />Terra will Re -Bid This Category
<br />1
<br />Only One Bidder- Recommend not awarding and will obtain 3 new quotes
<br />BC#32B-Landscaping
<br />$42,980
<br />$33,000
<br />$90,000
<br />Autumn Ridge Landscaping
<br />3
<br />BC#32C-Asphalt Paving
<br />$144,740
<br />$158,180
<br />$176,740
<br />Bituminous Roadways
<br />4
<br />BC#32D - Curb, Gutter & Sidewalks
<br />$78,700
<br />$105,706
<br />$95,200
<br />Ebert Construction
<br />4
<br />BC#33A- Site Utilities
<br />$84,000
<br />$107,210
<br />$117,262
<br />St. Paul Utilities
<br />5
<br />Potential Savings/Tax Exempt
<br />n/a
<br />($157,000)
<br />n/a
<br />SUB -TOTAL
<br />$5,799,244
<br />$7,042,599
<br />$8,305,763
<br />151 Total Bids
<br />Add Alternate #1- Basement EOC Room
<br />$10,340
<br />Add Alternate #4- High Speed Doors
<br />$46,000
<br />Sub -Total with Alternates
<br />$5,855,584
<br />$7,042,599
<br />$8,305,763
<br />Project Fee
<br />$90,762
<br />$109,160
<br />$128,739
<br />CMs Contingency
<br />$234,223
<br />$281,704
<br />$332,231
<br />TOTAL With Add Alternates #1 )
<br />$6,180,569
<br />$7,433,463
<br />$8,766,733
<br />Add Alternate #3- RTU Rsplacement(Separate Budget) $103,885
<br />
|