My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.3 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.3 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 2:01:29 PM
Creation date
10/16/2020 9:32:42 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additions and Deletions Report for <br />AIA° Document A 133T" - 2019 Exhibit A <br />This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added <br />to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original <br />AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. <br />Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part <br />of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by <br />AIA software at 11:52:13 CT on 10/15/2020. <br />PAGE 1 <br />This Amendment dated the 19th day of October in the year 72 220, is incorporated into the accompanying AIA <br />Document At33TM-2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 18th day of <br />October in the year 2020 (the "Agreement") <br />20-700 Elk River Public Safety Building Expansion and Fire Station No. 3 <br />City of Elk River <br />13065 Orono Parkway <br />Elk River. MN 55330 <br />Terra General Contractors, Limited Liability Company <br />dba Terra Construction <br />21025 Commerce Blvd., Ste 1000 <br />Rogers MN 55374 <br />§ A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Six Million Two Hundred <br />Ninety Thousand Two Hundred Nineteen and 00/100 ($ $6,290,219.00 J subject to additions and deductions by <br />Change Order as provided in the Contract Documents. <br />PAGE 2 <br />See Attached Low Bid Summary — Exhibit 1 <br />Alternate #1 — Basement EOC Room $10,340 <br />Alternate 43 — RTU Replacement $103,885 <br />Alternate #4 — High Speed Doors $46,000 <br />Unit Price # 1: Remove Unsuitable Material Cubic Yards $15.00 <br />Unit Price #2: Import and Place Select Cubic Yards $15.00 <br />Granular Material <br />Additions and Deletions Report for AIA Document A133'" — 2019 Exhibit A. Copyright 91991, 2003, 2009, and 2019 by The American Institute of Architects. All <br />rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without <br />permission. This document was produced by AIA software at 11:52:13 CT on 10/15/2020 under Order No.6421824392 which expires on 04/24/2021, is not for <br />resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, <br />e-mail copyright@aia.org. <br />User Notes: (1196584039) <br />
The URL can be used to link to this page
Your browser does not support the video tag.