My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AGREEMENT <br /> <br />10.0 Compensation and Payment <br />Total Obligation: The CLIENT’s total obligation to CONTRACTOR under this Agreement, including compensation <br />for goods, services, and reimbursable expenses, shall be Two Million, Seventy Thousand, Sixty-Seven and <br />No/100 Dollars ($2,070,067.00). Total obligation includes and is not limited to materials provided under Exhibit <br />K. <br /> <br />Invoices: CLIENT will pay CONTRACTOR after CONTRACTOR presents an invoice for the work completed and the <br />CLIENT Contact accepts the invoice. Invoices must be submitted timely and according to the schedule contained <br />in Exhibit B. Payment shall be made within 30 days following the receipt of a correct and proper invoice for the <br />completed delivery of the product or services. If the invoice is incorrect, defective, or otherwise improper, <br />CLIENT will notify CONTRACTOR within ten (10) Working Days of discovering the error. <br /> <br />Conditions of Payment: All services provided by CONTRACTOR under this Agreement must be performed to <br />CLIENT’s satisfaction, in accordance with all applicable federal, state, and local laws, ordinances, rules, and <br />regulations. CONTRACTOR will not receive payment for Work found by CLIENT to be unsatisfactory or performed <br />in violation of federal, state, or local law. <br /> <br />Retention: 5% retention shall be held by CLIENT on the Work. Upon receipt of CONTRACTOR’s written notice <br />that the Work is ready for final inspection and acceptance, and upon receipt of the final pay application for a <br />specific Facility Improvement Measure, the CLIENT will, within 10 working days, make such inspection, and when <br />the CLIENT finds the work acceptable under the Contract Documents and the scope of work for the Facility <br />Improvement Measure’s Final Completion, the CLIENT Contact shall approve final payment for the Finally <br />Complete Facility Improvement Measure and release the retention associated with the Facility Improvement <br />Measure according to the payment requirements outlined herein. <br /> <br />11.0 Contractor’s Energy Savings Guarantee <br />Guarantee Term: The term of CONTRACTOR’s Guarantee shall be the Term of the Agreement and shall survive <br />any earlier cancellation or termination of this Agreement. CONTRACTOR’s guarantee will be terminated if the <br />Technical Services Agreement – Performance Assurance Services are cancelled by the CLIENT. <br /> <br />Total Guaranteed Savings: CONTRACTOR guarantees that the amount to be saved in energy and operation costs <br />over the term of this Agreement shall be at least the “Total Guaranteed Savings” as set forth in Exhibit D which <br />Total Guaranteed Savings are sufficient to meet or exceed the total cost of the energy conservation measures. <br /> <br />Annual Meetings: CLIENT and CONTRACTOR shall meet at least once annually for the purpose of, reviewing <br />utility loads, changes in utility rates, operating hours and maintenance issues of equipment installed under this <br />Agreement, for the previous Guarantee Year. At each annual meeting, CLIENT will provide CONTRACTOR with <br />the applicable utility rates for the previous Guarantee Year. The Parties agree to hold the Annual Meeting within <br />thirty (30) Working Days after the final month of each Guarantee Year. In the event of chronic or material <br />equipment failure, CLIENT and CONTRACTOR will meet within a reasonable time after a request by the CLIENT to <br />discuss a timely cure for the failure. <br />AGREEMENT Page 8 of 15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.