My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT C <br />COMPLETION CERTIFICATES <br /> <br />Certificate of Final Completion <br />Pursuant to the Agreement, by and between the CONTRACTOR and the CLIENT, the CLIENT does hereby <br />acknowledge the following: <br /> <br />3. Completion and Acceptance. The CLIENT agrees that the Work specified in the agreement and any <br />applicable amendments thereof have been completed by the CONTRACTOR and are hereby accepted by <br />the CLIENT. <br /> <br />4. Project Completion Documents. The CLIENT has received four (4) copies of the following project <br />completion documents <br /> <br />a. Final detailed project costs <br />b. All amended exhibits <br />c. All as-built documentation <br />d. Operating manual including vendor cut sheet giving general instructions and installation <br />instructions, name plate data, parts list along with local service representative and pricing sheet, <br />detailed system description with operating instruction, and detailed adjustment instructions <br />including alignments, tolerances, etc. <br />e. Manufacturer warranty documentation and information including contact names and telephone <br />numbers. <br /> <br />5. Facility Improvement Measure (FIM) Approval. <br /> <br />Client Approval <br />FIM Description <br />Signature Date * <br />Microbiological Air Cleaning <br /> <br />AHU Replacement – City Hall <br /> <br />Ventilation Replacement – Ice Arena (Turf) <br /> <br />Building Envelope Improvements <br /> <br />Lighting Upgrade <br /> <br />Control Enhancements / replacements <br /> <br />Duct Sealing - Library <br /> <br />Boiler Plant Replacement – City Hall <br /> <br />Boiler Plant Addition – Library <br /> <br />Commissioning – Ice Arena <br /> <br /> <br /> <br />6. Punch List. The CONTRACTOR has completed all project punch list items <br />EXHIBIT C Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.