Laserfiche WebLink
<br />EXHIBIT A <br />SUMMARY OF WORK <br /> <br />Cx - Commissioning of the new building addition of the Ice Arena <br /> <br /> HVAC equipment & Ice Making equipment analysis – Consultant will investigate existing equipment <br />operations and controls to identify deficiencies with the equipment, controls, and sequences for the <br />facility equipment. <br /> Facility deficiencies – Consultant, while investigating the installed equipment, will document any <br />deficiencies that are encountered. <br /> Analysis – Consultant will analyze any potential facility improvement measures (FIM’s) identified to <br />quantify the savings potential for each FIM. Savings calculations shall meet the requirements for <br />obtaining both the study rebate and future rebates for the execution of any identified improvements. <br /> Budgets – Consultant shall make cost estimates for FIM’s identified. Budgets provided will be usable by <br />the Client for budgeting of future work. <br /> Report – All findings will be summarized in a written report provided to the Client. The report will be <br />presented to the Client once the report is finalized. <br /> <br />Lighting – All Buildings <br /> <br />Room by room light list with energy calculation are found at the end of exhibit D: Facility Operating Parameters <br />& Utility Savings Calculation Methods <br />EXHIBIT A Page 13 of 13 <br /> <br />