My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br />SUMMARY OF WORK <br /> <br />B. RTU-2 <br />a. Trane: YHC102E3EHA <br />b. 8.5 Ton unit: 3,400 CFM <br />c. 72” x 48” Dimensions <br /> <br />Westbound Liquor <br />A. RTU-1 <br />a. Trane: YCD181C3HACA <br />b. 15 Ton unit: 6,000 CFM <br />c. 80” x 48” Dimensions <br />B. RTU-2 <br />a. Trane: YCD181C3HACA <br />b. 15 Ton unit: 6,000 CFM <br />c. 80” x 48” Dimensions <br />City Hall AHU Replacement: Contractor to remove existing air handling units and replace with like units <br />Mechanical <br />A. Remove existing equipment, disconnect hot water, chilled water lines and DX lines for re-use on new <br />equipment <br />B. Units shall be in the same location as existing <br />a. To get new units into the penthouse, remove existing OA louvers, stucco walls from corner to <br />expansion joint <br />b. Wall area 5’ High by 21’ Long <br />c. Two louvers (28” x 88” each) <br />d. Replace wall as needed and replace stucco with metal sheeting to match new outdoor air <br />louvers <br />C. Replace unit with new unit, see attached schedule <br />D. Reconnect the supply and return ductwork, hot water lines, and chilled water lines <br />E. Reuse existing AFMS <br />F. Provide any new disconnects as needed for this scope <br />G. RTU-7 <br />a. Replace some of the hot water piping as noted on the drawings. <br />b. New hot water piping shall go into new roof curb / adaptor for hot water coil <br />c. Install new controls provided 2 way valve for new unit. <br />d. Condenser shall be located in same location as old. <br />e. Provide and install new refrigeration lines for unit and condenser <br />Electrical: <br />A. Disconnect equipment for Mechanical Contractor to remove. <br />B. Provide electrical power for the new equipment <br />Controls: <br />A. Disconnect any controls from the equipment <br />B. All AHU’s will have VFD’s on them <br />C. Provide new Controls for the new equipment – Field Mounted Controls <br /> <br /> <br />Ice Rink – Dry Event AHU Replacement: Contractor to replace existing dehumidification unit with new heating <br />and cooling unit for dry floor space. <br />EXHIBIT A Page 5 of 13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.