Laserfiche WebLink
<br />EXHIBIT A <br />SUMMARY OF WORK <br /> <br />Scope of Work: <br />Bipolar Ionization Unit for AHU’s: Contractor to install new equipment for the following locations. Pricing shall <br />be broken down by location. <br /> <br />Mechanical <br />A. Furnish and install needle point bipolar ionization <br />B. Provide electrical installation as required. <br />C. Provide equipment start up and testing as required. <br /> <br />Controls <br />A. Connect GPS units into existing HumeraTech automation system <br />B. Provide graphics on equipment <br /> <br />Locations and Equipment All Dimensions are based on With x Height <br />City Hall <br />A. AHU-1 <br />a. 14,200 CFM <br />b. 108” x 42” Dimensions <br />B. AHU-2 <br />a. 3,500 CFM <br />b. 42” x 26” Dimensions <br />C. AHU-3 <br />a. 2,400 CFM <br />b. 42” x 20” Dimensions <br />D. AHU-4 <br />a. 11,000 CFM <br />b. 82” x 42” Dimensions <br />E. AHU-6 <br />a. 2,750 CFM <br />b. 48” x 26” Dimensions <br />F. RTU-7 <br />a. 14,000 CFM <br />b. 90” x 50” Dimensions <br /> <br />Public Safety <br />A. RTU-1 <br />a. McQuay <br />b. 96” x 45” Dimensions <br /> <br />Fire Station 1 <br />B. RTU-1 <br />a. Bryant Heating & Cooling Systems (574ANW030060AABT) <br />b. 2.5 Tons; 1000 CFM <br />C. RTU-2 <br />a. Carrier: 48TFE006311 <br />b. 5 Ton; 1600 CFM <br />EXHIBIT A Page 3 of 13 <br /> <br />