Laserfiche WebLink
a. Zone Change <br />■ R2-a currently <br />■ RI-c proposed <br />■ Consistent with surrounding zoning <br />■ Government facilities allowed in both with CUP <br />■ The rezoning would be consistent with the City of Elk River <br />Land Use Plan <br />