Laserfiche WebLink
DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />14 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />09/17/20 <br />In tabulations <br />below, amounts are stated to the nearest dollar. <br />PERIOD <br />TO: <br />09/30/20 <br />WEIDNER MECHANICAL <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />10.105 Bond <br />$10,333.00 <br />$10,333.00 <br />$10,333.00 <br />100.00% <br />$516.65 <br />2 <br />10.109 Allowance <br />$7,500.00 <br />$7,500.00 <br />$7,500.00 <br />100.00% <br />$375.00 <br />3 <br />10.115 Pipe & Fittings <br />$235,689.00 <br />$235,689.00 <br />$235,689.00 <br />100.00% <br />$11,784.45 <br />4 <br />10.119 Drains & Carriers <br />$47,196.00 <br />$47,196.00 <br />$47,196.00 <br />100.00% <br />$2,359.80 <br />5 <br />10.123 Pumps & Tanks <br />$5,400.00 <br />$5,400.00 <br />$5,400.00 <br />100.00% <br />$270.00 <br />6 <br />10.127 Water Heaters <br />$82,739.00 <br />$82,739.00 <br />$82,739.00 <br />100.00% <br />$4,136.95 <br />7 <br />10.137 Plumbing Fixtures & <br />$79,004.00 <br />$79,004.00 <br />$79,004.00 <br />100.00% <br />$3,950.20 <br />Trim <br />8 <br />10.139 Misc Plumbing <br />$42,488.00 <br />$42,488.00 <br />$42,488.00 <br />100.00% <br />$2,124.40 <br />9 <br />11.185 Labor - Plumbing <br />$560,753.00 <br />$560,753.00 <br />$560,753.00 <br />100.00% <br />$28,037.65 <br />10 <br />30.300 Digging/Backfill <br />$37,034.00 <br />$37,034.00 <br />$37,034.00 <br />100.00% <br />$1,851.70 <br />11 <br />30.325 Rentals <br />$13,000.00 <br />$13,000.00 <br />$13,000.00 <br />100.00% <br />$650.00 <br />12 <br />30.360 Pipe Covering <br />$84,864.00 <br />$84,864.00 <br />$84,864.00 <br />100.00% <br />$4,243.20 <br />1 <br />Plumbing (CO #1) <br />$7,430.00 <br />$7,430.00 <br />$7,430.00 <br />100.00% <br />$371.50 <br />1 <br />Plumbing (CO #2) <br />($2,203.00) <br />($2,203.00) <br />($2,203.00) <br />100.00% <br />($110.15) <br />1 <br />Plumbing (CO #3) <br />($2,980.00) <br />($2,980.00) <br />($2,980.00) <br />100.00% <br />($149.00) <br />1 <br />Plumbing (CO #4) <br />$2,506.00 <br />$2,506.00 <br />$2,506.00 <br />100.00% <br />$125.30 <br />1 <br />Plumbing (CO #5) <br />$10,815.00 <br />$10,815.00 <br />$10,815.00 <br />100.00% <br />$540.75 <br />1 <br />Plumbing (CO #6) <br />$1,338.00 <br />$1,338.00 <br />$1,338.00 <br />100.00% <br />$66.90 <br />1 <br />Plumbing (CO #7) <br />$15,209.00 <br />$15,209.00 <br />$15,209.00 <br />100.00% <br />$760.45 <br />1 <br />Plumbing (CO #8) <br />$2,645.00 <br />$2,645.00 <br />$2,645.00 <br />100.00% <br />$132.25 <br />1 <br />Plumbing (CO #9) <br />$10,615.00 <br />$10,615.00 <br />$10,615.00 <br />100.00% <br />$530.75 <br />1 <br />Plumbing (CO #10) <br />$25,562.00 <br />$25,562.00 <br />$25,562.00 <br />100.00% <br />$1,278.10 <br />1 <br />Plumbing (CO #6) <br />$2,041.00 <br />$2,041.00 <br />$2,041.00 <br />100.00% <br />$102.05 <br />1 <br />Plumbing (CO #11) <br />$26,547.00 <br />$26,547.00 <br />$26,547.00 <br />100.00% <br />$1,327.35 <br />1 <br />Plumbing (CO #12) <br />$1,943.00 <br />$1,943.00 <br />$1,943.00 <br />100.00% <br />$97.15 <br />1 <br />Plumbing (CO #13) <br />$6,842.00 <br />$6,842.00 <br />$6,842.00 <br />100.00% <br />$342.10 <br />1 <br />Plumbing (CO #14) <br />$771.00 <br />$771.00 <br />$771.00 <br />100.00% <br />$38.55 <br />1 <br />Plumbing (CO #15) <br />$1,020.00 <br />$1,020.00 <br />$1,020.00 <br />100.00% <br />$51.00 <br />Page 1 of 2 <br />