Laserfiche WebLink
PAY ESTIMATE #2 FINAL- WORT( COMPLETE THROUGH SEPTEMBER 1, 2020 <br />2020 STREET IMPROVEMENTS <br />CITY OF <br />ELK RIVER, MINNESOTA <br />ITEM <br />APPROX. <br />NO. <br />ITEM <br />QUANT. <br />1 <br />COMMON EXCAVATION <br />270 <br />2 <br />AGGREGATE BASE, CLASS 5 <br />150 <br />3 <br />TYPE 12.5 NON WEARING COURSE MIXTURE (SPNW8230C) <br />940 <br />4 <br />TYPE 9.5 WEARING COURSE MIXTURE (SPWEA240C) <br />3630 <br />5 <br />BITUMINOUSPATCH <br />20 <br />6 <br />CATCH BASIN CONCRETE REINFORCEMENT <br />35 <br />7 <br />TURF RESTORATION <br />1250 <br />8 <br />MILL BITUMINOUS SURFACE (1.25") <br />9500 <br />9 <br />MILL BITUMINOUS SURFACE (TAPER 1.25" -0") <br />20000 <br />10 <br />RECLAIM BITUMINOUS SURFACE <br />7000 <br />11 <br />PLACE SALVAGED RECLAIM - <br />380 <br />12 <br />SHAPE AND COMPACT IN -PLACE RECLAIM MATERIAL <br />1 <br />13 <br />B" WHITE PAVEMENT STRIPE - EPDXY <br />' 1075 <br />14 <br />4" WHITE PAVEMENT STRIPE - EPDXY <br />1647 <br />PREVIOUS DEDUCTIONS ON ESTIMATE #1 <br />$5.60 per ton on SPWEA240 used in Windsor Park Entrance <br />CONTRACTOR:. <br />North Valley, <br />BY: <br />DATE: <br />CONTRACTOR: North Valley Inc. <br />20015 Iguana St. <br />Nowthen, MN <br />55330 <br />Contract <br />Contract <br />Previously <br />UNIT <br />Unit Price <br />Amount <br />Used <br />CY (EV) <br />$ <br />29.00 <br />$ 7,830.00 <br />266 <br />TON <br />$ <br />12.87 <br />$ 1,930.50 <br />241 <br />TON <br />$ <br />62.16 <br />$ 52,214.40 <br />920.26 <br />TON <br />$ <br />74.00 <br />$ 268,620.00 <br />2911.6 <br />SY <br />$ <br />83.13 <br />$ 1,662.60 <br />0 <br />EA <br />$ <br />648.93 <br />$ 22,712.55 <br />37 <br />SY <br />$ <br />9.57 <br />$ 10,712.50 <br />0 <br />SY <br />$ <br />1.10 <br />$ 10,450.00 <br />10042 <br />LF <br />$ <br />0.85 <br />$ 17,000.00 <br />11684 <br />SY <br />$ <br />1.34 <br />$ 9,380.00 <br />70DO <br />CY (CV) <br />$ <br />17.58 <br />$ 6,680.40 <br />386 <br />LS <br />$ <br />4,795.72 <br />$ 4,795.72 <br />1 <br />LF <br />$ <br />3.43 <br />$ 3,687.25 <br />0 <br />LF <br />$ <br />2.90 <br />$ 4,776.30 <br />0 <br />TOTAL <br />$ 422,452.22 <br />TONS DEDUCTION PREVIOUS PAYMENTS <br />193.73 $ 1,084.B9 <br />ENGINEER: <br />Justin Ferririte, P.E. <br />BY: <br />DATE: 1 <br />Amount <br />Previously Paid <br />$ 7,714.00 <br />$ 3,101.67 <br />$ 57,203.36 <br />$ 215,45B.40 <br />$ 24,010.41 <br />$ 11,046.20 <br />$ 9,931.40 <br />$ 9,380.00 <br />$ 6,785.88 <br />$ 4,795.72 <br />$ 349,427.04 <br />$ 348,342.15 <br />Used this Amount this <br />Estimate Estimate <br />0 $ <br />- <br />0 $ <br />0 $ <br />762.34 $ <br />56,413.16 <br />0 $ <br />0 $ <br />2420.5 $ <br />20,743.69 <br />1358 $ <br />1,493.80 <br />0 $ <br />- <br />0 $ <br />0 $ <br />- <br />0 $ <br />- <br />893 $ <br />3,062.99 <br />1427 $ <br />4,138.30 <br />Total <br />Total <br />Used <br />Amount <br />266 $ <br />7,714.00 <br />241 $ <br />3,101.67 <br />920.26 $ <br />57,203.36 <br />3673.94 $ <br />271,871.56 <br />0 $ <br />- <br />37 $ <br />24,010.41 <br />2420.5 $ <br />20,743.69 <br />11400 $ <br />12,540.00 <br />11684 $ <br />9,931.40 <br />7000 $ <br />9,380.00 <br />386 $ <br />6,785.88 <br />1 $ <br />4,795.72 <br />893 $ <br />3,062.99 <br />1427 $ <br />4,138.30 <br />$ <br />435,278.98 <br />