Laserfiche WebLink
DocuSign Envelope ID: B21CAEBD-7600-4BB5-BB91-7BFCFA6AOB90 <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />11 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />09/10/20 <br />In tabulations <br />below, amounts are stated to the nearest dollar. <br />PERIOD <br />TO: <br />09/30/20 <br />High Five Erectors II, Inc. <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D THIS PERIOD <br />STORED (NOT IN <br />AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />1 <br />051200 Structural Steel <br />$129,841.00 <br />$129,841.00 <br />$129,841.00 <br />100.00% <br />$6,492.05 <br />2 <br />052100 Steel Joists <br />$100,523.00 <br />$100,523.00 <br />$100,523.00 <br />100.00% <br />$5,026.15 <br />3 <br />053100 Steel Decking <br />$45,888.00 <br />$45,888.00 <br />$45,888.00 <br />100.00% <br />$2,294.40 <br />4 <br />055000 Metal Fabrications <br />$8,508.00 <br />$8,508.00 <br />$8,508.00 <br />100.00% <br />$425.40 <br />5 <br />055100 Metal Pan Stairs <br />$43,996.00 <br />$43,996.00 <br />$43,996.00 <br />100.00% <br />$2,199.80 <br />6 <br />055213 Pipe & Tube Railings <br />$71,614.00 <br />$71,614.00 <br />$71,614.00 <br />100.00% <br />$3,580.70 <br />7 <br />Allowance <br />$30,000.00 <br />$30,000.00 <br />$30,000.00 <br />100.00% <br />$1,500.00 <br />8 <br />Bond <br />$5,380.00 <br />$5,380.00 <br />$5,380.00 <br />100.00% <br />$269.00 <br />1 <br />Structural Steel Erection (CO <br />$4,190.00 <br />$4,190.00 <br />$4,190.00 <br />100.00% <br />$209.50 <br />#1) <br />1 <br />Structural Steel Erection (CO <br />($6,888.15) <br />($6,888.15) <br />($6,888.15) <br />100.00% <br />($344.41) <br />#2) <br />1 <br />Structural Steel Erection (CO <br />$500.00 <br />$500.00 <br />$500.00 <br />100.00% <br />$25.00 <br />#3) <br />1 <br />Structural Steel Erection (CO <br />$672.00 <br />$672.00 <br />$672.00 <br />100.00% <br />$33.60 <br />#4) <br />1 <br />Structural Steel Erection (CO <br />$3,000.00 <br />$3,000.00 <br />$3,000.00 <br />100.00% <br />$150.00 <br />#5) <br />1 <br />Structural Steel Erection (CO <br />$8,650.00 <br />$8,650.00 <br />$8,650.00 <br />100.00% <br />$432.50 <br />#6) <br />1 <br />Structural Steel Erection (CO <br />$600.00 <br />$600.00 <br />$600.00 <br />100.00% <br />$30.00 <br />#7) <br />1 <br />Structural Steel Erection (CO <br />$1,200.00 <br />$1,200.00 <br />$1,200.00 <br />100.00% <br />$60.00 <br />#7) <br />1 <br />Structural Steel Erection (CO <br />$3,040.00 <br />$3,040.00 <br />$3,040.00 <br />100.00% <br />$152.00 <br />#8) <br />1 <br />Structural Steel Erection (CO <br />$1,752.00 <br />$1,752.00 <br />$1,752.00 <br />100.00% <br />$87.60 <br />#9) <br />1 <br />Structural Steel Erection (CO <br />($303.85) <br />($303.85) <br />($303.85) <br />100.00% <br />($15.19) <br />#10) <br />1 <br />Structural Steel Erection (CO <br />$4,217.00 <br />$4,217.00 <br />$4,217.00 <br />100.00% <br />$210.85 <br />#10) <br />1 <br />Structural Steel Erection (CO <br />$844.00 <br />$844.00 - <br />- <br />$844.00 <br />100.00% <br />- <br />$42.20 <br />Page 1 of 2 <br />