Laserfiche WebLink
$ 7 5.00 Dual Fuel & ETS Equipment Costs$ 200.00 EV Equipment Costs <br />$ 5 6.25 ERMU Dual Fuel & ETS Field Labor Costs <br />2021 CIP Budget (Rebate and Operating)$ - Contract Labor & Equipment for Transition of LM Participants <br />20212021202120212021202120212021 <br />Historical Participation <br />ERMU <br />Operating Total ERMU <br />Residential Programs <br />Direct LaborOnlyERMU RebateSpending <br />2021 Budget2020 Budget2019 ActualG & AAdvrt.Equip.ContractkWh Saved <br />Off-Peak (ETS) Space Heating (Systems)4104$225$200$0$2,000$0$2,425$0$2,425 <br />Dual Fuel Heating (Systems)2752$113$150$0$5,000$0$5,263$0$5,263 <br />Electric Vehicle Charging in Home10206$563$2,000$6,000$4,000$3,000$15,563$10,000$25,563 <br />Off-Peak (ETS) Storage Water Heat4$225$800$0$0$0$1,025$2,000$3,025 <br />Load Control Audits0020$0$0$0$0$0$0$0$0 <br />CAC Installation606053$1,350$1,500$1,000$0$0$3,850$9,000$12,85030,000 <br />ASHP Installation5102$113$1,500$1,000$0$0$2,613$2,900$5,51331,145 <br />ECM Furnace Motor859081$1,913$1,500$1,000$0$0$4,413$8,500$12,91362,220 <br />CAC Tune-Up150170147$3,375$1,500$1,000$0$0$5,875$9,000$14,87515,000 <br />Programmable Thermostat (New 2021)1500$3,375$3,500$6,000$500$0$13,375$3,750$17,12593,000 <br />Ground Source Heat Pump (tons)5103$1,000$1,000$1,000$0$0$3,000$2,000$5,00022,400 <br />Ductless ASHP151512$338$500$1,000$0$0$1,838$6,000$7,838176,130 <br />Residential Cooling230255252275 <br />Clothes Washer409017$750$500$1,000$0$0$2,250$1,000$3,2507,320 <br />Dishwasher202523$375$500$1,000$0$0$1,875$500$2,3751,200 <br />Refrigerator New ONLY000$1,000$0$0$1,000$0$1,000 <br />Refrigerator New w/Recycle607051$1,125$500$1,000$0$0$2,625$4,500$7,12562,820 <br />Refrigerator Harvest10100$188$500$1,000$0$0$1,688$750$2,4389,150 <br />Pool Pump5102$188$500$1,000$0$0$1,688$1,000$2,68810,500 <br />Heat Pump Water Heaters1052$375$500$1,000$0$0$1,875$3,500$5,37521,280 <br />Freezer 550$94$0$0$0$0$94$375$469 <br />Dehumidifier152511$281$500$1,000$0$0$1,781$375$2,1566,525 <br />LED Rebates9004000736$1,500$1,000$1,000$0$0$3,500$1,800$5,30040,500 <br />Fluorescent Lamp Recycling25000$500$500$500$0$0$1,500$100$1,600 <br />Income Eligible (CAP Agency)558350012000500012000$ 28,000$ 3,000$ 10,00031,000 <br />Residential Audits3$3,375$500$0$500$2,000$6,375$0$6,375 <br />Energy City00$8,320$0$0$0$0$8,320$0$8,320 <br />MN Division of Energy Resources Assessment$32,000$32,000$32,000 <br />Clean Energy Choice$2,000$2,000$2,000 <br />Distributed Renewable Generation (Field Services)$27,368$27,368$27,368 <br />Energy City Solar Table and Shelter$0$0 <br />MMUA CIP Director Contribution and Education$4,000$575$0$0$1,300$5,875$5,875 <br />Field Services Labor for Program Delivery$0 <br />Residential and Misc. Total$37,158$32,225$30,000$12,000$77,668$189,051$70,050$259,101851,465.00 <br />Commercial Programs <br />Direct LaborG & AAdvert.EquipContractERMU OPERMU RebateTotal ERMU <br />Custom55$5,000$2,000$1,000$0$2,000$10,000$20,000$30,000300,000 <br />Vending Machine Control/ Door Miser$0$0$0$0$0$0$0$0- <br />Consultations - Commissioning200$2,000$800$0$0$0$2,800$0$2,10017,500 <br />Chiller, Cooling Towers, VAV,22$3,000$1,200$1,500$0$0$5,700$30,000$35,700595,000 <br />Design Assistance/Audits/Energy Star/Green Globe44$0$0$500$0$2,000$2,500$0$2,50031,250 <br />Energy Star Certification$0$0$500$0$0$500$0$5005,000 <br />Ground Source Heat Pump10$0$0$1,500$0$0$1,500$10,000$11,500153,333 <br />LED Lighting65$5,000$2,000$2,500$0$0$9,500$95,000$104,5001,412,162 <br />New Construction Lighting55$4,000$1,600$2,500$0$0$8,100$30,000$38,100624,590 <br />Retrofit Lighting2522$6,000$2,400$2,500$0$0$10,900$20,000$30,900498,387 <br />Premium Efficient Motors/VSD03$0$0$0$0$0$0$0$0- <br />Variable Frequency Drives502$5,000$2,000$1,500$0$0$8,500$10,000$18,500336,364 <br />Roof Top Units, Split Condenser, Economizer1010$1,500$600$1,500$0$0$3,600$6,000$9,600152,381 <br />Small Commercial AC Tune-Up2020$1,500$600$1,000$0$0$3,100$1,200$4,30028,667 <br />Commercial Total$33,000$13,200$16,500$0$4,000$66,700$222,200$288,9004,154,634 <br />Grand Total$70,158$45,425$46,500$12,000$81,668$255,751$292,250$548,0015,006,099 <br />Summary <br />Energy Savings Goal5,005,684 $255,751ERMU Operating Budget <br />Total Spending 547,350$ $292,250ERMU Rebates <br />Low-Income26,134.00$ $548,001ERMU Budget <br />Disdributed Renewable Generation27,368$ $547,350Total Required Spending 2021 <br />64 <br />