My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. PCSR 09-22-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
09-22-2020
>
4.5. PCSR 09-22-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2020 12:35:13 PM
Creation date
9/18/2020 12:28:29 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> <br />>> <br />>>>>>>>>>>>>>>>>RIM=879.90INV=875.2RIM=881.62INV=875.8 SINV=876.1 WRIM=881.30INV=877.6RIM=882.17INV=878.4RIM=883.92INV=872.2 W/SE886.43FE886.31DS886.01DS885.81DSRIM=885.12INV=864.0 N/SRIM=880.43INV=877.3 SINV=876.6 EORONO PARKWAY NW886.08DR 8270882.24MHS886.06FE <br />RIM=883.40INV=870.9 E, 870.8 S886.05FE886.06FE886.02DS <br />RIM=884.77INV=876.7RIM=880.68INV=860.3 >>>>>>>>>>>>885.96DR885.89FE885.92 <br />DR886.38DS886.28FE3291881.26CBE 4.7W 4.8EAST 12IN RCP>>>>COMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOM COM COM COM COM COM COM COM <br />GGGGGGGGGGGGGGGGGCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMCOMUEUEUEUEUEUEUEUEUEUEUEUEXXXXXXXXXXXXXXCOMCOMCOMCOMCOMCOMC <br />OMCOMCOM OUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUOUXXXXXXXXXXXXXXXXXXXXXXXXXX <br />XX <br />XXXXXXXXUECOMCOM COM COM COM COM COM COM COM COMCOMFFE: 886.00FFE: 886.00XXXXX X X X X X X X X X X X X X X X XXXXXXXXX1111111111222233533344444967777887788877791010101010101112131212372147DWN BY:ISSUE DATE:PROJECT NO.:1634-20-500DESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:CLIENT:EXPANSION OF ELK RIVER <br />PUBLIC SAFETY BUILDING <br />CITY OF ELK RIVER <br />SHERBURNE COUNTY, MINNESOTAJTPCHK'D BY:JRAAPP'D BY:DMLCERTIFICATION:8/31/2020 10:08:01 AMM:\1634\20-500 Elk River Fire Station 3 And City Hall Expansion\city Hall Expansion\5_DESIGN\1_CAD\3 Plansheets\C-601 PAVING PLAN.dwg <br />PROJECT TITLE <br />CUP SUBMISSION08/31/2020 1DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WASPREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM ADULY LICENSED PROFESSIONALENGINEER UNDER THE LAWS OF THESTATE OF MINNESOTA.LICENSE NO.:7500 OLSON MEMORIAL HWYSUITE 300GOLDEN VALLEY, MN 55427PHONE: 763-252-6800FAX: 952-831-1268WWW.WENCK.COM08/31/20201C-601PAVING PLANWARNING:THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALLCOOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND/OR RELOCATION OF LINES.THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FORTHE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIEDSTRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURINGCONSTRUCTION AT NO COST TO THE OWNER.GOPHER STATE ONE CALLTWIN CITY AREA: 651-454-0002TOLL FREE 1-800-252-1166CALL BEFORE YOU DIGLOT LINEEASEMENT LINEPROPERTY BOUNDARYCURB AND GUTTERTIP-OUT CURB AND GUTTERCONCRETE SIDEWALKCONCRETE PAVEMENTHEAVY DUTY BITUMINOUS PAVEMENTBITUMINOUS PAVEMENT PATCHINGLEGEND1.SEE SHEET C-002 FOR ADDITIONAL PROJECT NOTES.2.CONTRACTOR TO ENSURE FINAL GRADE OF PATCHEDBITUMINOUS PAVEMENT REPLICATES EXISTING GRADE PRIORTO CONSTRUCTION, WHERE APPLICABLE. ENSURE POSITIVEDRAINAGE.NOTES1.MATCH EXISTING2.CONCRETE SIDEWALK - SEE DETAIL3.CONCRETE PAVEMENT - SEE DETAIL4.BITUMINOUS PAVEMENT - SEE DETAIL5.CONCRETE PAD UNDER GARBAGE ENCLOSURE - SEESTRUCTURAL PLANS6.PATCH BITUMINOUS PAVEMENT - MATCH EXISTING SECTION7.B612 CURB AND GUTTER - SEE DETAIL8.B612 TIP-OUT CURB AND GUTTER - SEE DETAIL9.B624 CURB AND GUTTER - SEE DETAIL10.5' TRANSITION BETWEEN STANDARD AND TIP-OUT GUTTER11.5' TRANSITION BETWEEN CURB TYPES12.3' TRANSITION FROM FULL HEIGHT TO ZERO HEIGHT CURB13.CONCRETE DRIVEWAY APRON - SEE DETAILKEYNOTES#LIGHT DUTY BITUMINOUS PAVEMENT
The URL can be used to link to this page
Your browser does not support the video tag.