Laserfiche WebLink
§ 4.1.3 Structural and Environmental Tests, Surveys and Reports. During the Preconstruction Phase, the Owner shall <br />furnish the following information or services with reasonable promptness. The Owner shall also furnish any other <br />information or services under the Owner's control and relevant to the Construction Manager's performance of the Work <br />with reasonable promptness after receiving the Construction Manager's written request for such information or services. <br />Subject to written disclaimer or qualification from the Owner as to accuracy, the Construction Manager shall be entitled <br />to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions <br />relating to the safe performance of the Work. <br />§ 4.1.3.1 The Owner shall furnish tests, inspections, and reports, required by law and as otherwise agreed to by the <br />parties, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous <br />materials. <br />§ 4.1.3.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for <br />the site of the Project, and a written legal description of the site. The surveys and legal information shall include, as <br />applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; designated wetlands; <br />adjacent drainage; rights -of -way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and <br />contours of the site; locations, dimensions and other necessary data with respect to existing buildings, other <br />improvements and trees; and information concerning available utility services and lines, both public and private, above <br />and below grade, including inverts and depths. All the information on the survey shall be referenced to a Project <br />benchmark. <br />§ 4.1.3.3 The Owner, when such services are requested, shall furnish services of geotechnical engineers, which may <br />include test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous <br />materials, seismic evaluation, ground corrosion tests and resistivity tests, including necessary operations for anticipating <br />subsoil conditions, with written reports and appropriate recommendations. <br />§ 4.1.4 During the Construction Phase, the Owner shall furnish information or services required' of the Owner by the <br />Contract Documents with reasonable promptness. The Owner shall also furnish any other information or services under <br />the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness <br />after receiving the Construction Manager's written request for such information or services. <br />§ 4.1.5 If the Owner identified a Sustainable Objective in Article 1, the Owner shall fulfill its responsibilities as required <br />in AIA Document E234Tm--2019, Sustainable Projects Exhibit, Construction Manager as Constructor Edition, attached <br />to this Agreement. <br />§ 4.2 Owner's Designated Representative <br />The Owner shall identify a representative authorized to act on behalf of the Owner with respect to the Project. The <br />Owner's representative shall render decisions promptly and furnish information expeditiously, so as to avoid <br />unreasonable delay in the services or Work of the Construction Manager. Owner's representative shall have only such <br />authority in matters of Contract Price increase as delegated to the representative in writing by Owner's Council. Except <br />as otherwise provided in Section 4.2.1 of A201-2017, the Architect does not have such authority, <br />§ 4.2.1 Legal Requirements. The Owner shall furnish all legal, insurance and accounting services, including auditing <br />services, that may be reasonably necessary at any time for the Project to meet the Owner's needs and interests. <br />§ 4.3 Architect <br />The Owner shall retain an Architect to provide services, duties and responsibilities as described in AIA Document <br />B 133Tm--2019, Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor <br />Edition, as modified, including any additional services requested by the Construction Manager that are necessary for the <br />Preconstruction and Construction Phase services under this Agreement. The Owner shall provide the Construction <br />Manager with a copy of the scope of services in the executed agreement between the Owner and the Architect, and any <br />further modifications to the Architect's scope of services in the agreement. <br />ARTICLE 5 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES <br />§ 5.1 Compensation <br />§ 5.1.1 For the Construction Manager's Preconstruction Phase services described in Sections 3.1 and 3.2, the Owner <br />shall compensate the Construction Manager as follows: <br />(Insert amount of, or basis for compensation and include a list of reimbursable cost items, as applicable.) <br />AIA Do—ent A133' - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br />"AmC+rt car it stn at' of 1ich to ts,' `AIA,' the AIA Logo, and `AIA Contract Do<;ument are registered tr dema ks and may not b ased �� <br />without �� rm Ls,ion. This draft was produced by AIA software at 13:58:42 ET on 06/29/2020 under Order No.2067434383 which expires on <br />04/02/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br />of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1834312825) <br />