Laserfiche WebLink
Terra <br />MI CONSTRUCTION <br />September 17, 2020 <br />Mr. Brandon Wisner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />763.463.0220 <br />877.604.2118 <br />info@terragc.com <br />terragc.com <br />RE: City of Elk River Police Safety Building Expansion and Fire Station No. 3 Estimate <br />Dear Mr. Wisner, <br />Terra Construction (Terra) submits this project estimate based off of the design development drawings <br />of the Public Safety Building Expansion dated August 5, 2020 provided by BKV Group. Attached is an <br />itemized breakdown of the construction estimate for the Public Safety Building Expansion and below is <br />a summary of the overall project costs. <br />Soft Costs <br />Public Safety & FS3 Soft Costs <br />$ 1,425,220.00 <br />Public Safety Building Expansion <br />Fire Addition <br />$ 3,192,646.00 <br />Police Addition & Renovation <br />$ 4,233,601.00 <br />Fire Station #3 <br />New Ground -Up Fire Station #3 <br />$ 5,880,000.00 <br />TOTAL: <br />$ 14,731,467.00 <br />Please feel free to contact me with any questions. <br />Respectfully Submitted, <br />Terra Construction <br />Ben Newlin <br />Vice President <br />Attachment: Public Safety Building Expansion Estimate <br />0 <br />21025 Commerce Blvd, Suite 1000 11 Rogers, MN 55374 <br />