Laserfiche WebLink
_CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar <br />CROSSTOWN MASONRY, INCORPORATED <br />A B <br />C D <br />E <br />WORK COMPLETED <br />ITEM DESCRIPTION OF WORK <br />NUM <br />SCHEDULED FROM PREVIOUS <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />+ E) <br />1 Footings & Foundation Labor <br />$30,000.00 $30,000.00 <br />2 Footings & Foundation Material <br />$8,000.00 $8,000.00 <br />3 Above Grade CMU Labor <br />$84,000.00 $84,000.00 <br />4 Above Grade CMU Material <br />$26,000.00 $26,000.00 <br />5 Slab on Grade Labor <br />$5,300.00 $5,300.00 <br />6 Slab on Grade Material <br />$4,200.00 $4,200.00 <br />7 Stone Piers Labor <br />$17,000.00 <br />$17,000.00 <br />8 'Stone Piers Material <br />$10,000.00 <br />$10,000.00 <br />9 1 Dug Outs/Batting Cage Labor <br />$41,000.00 $41,000.00 <br />10 Dug Outs/Batting Cage <br />$28,000.00 $28,000.00 <br />APPLICATION NO.: <br />13 <br />APPLICATION DATE: <br />08/24/20 <br />PERIOD TO: <br />08/31/20 <br />PROJECT NO.: <br />19520-0033 <br />F <br />MATERIALS <br />G <br />TOTAL <br />H <br />PRESENTLY <br />COMPLETED % <br />BALANCE TO <br />STORED (NOT IN <br />AND STORED TO (G + C) <br />FINISH (C - G) <br />D OR E) <br />DATE <br />$30,000.00 100.00% <br />$8,000.00 100.00% <br />$84,000.00 100.00% <br />$26,000.00 100.00% <br />$5,300.00 100.00% <br />$4,200.00 100.00% <br />- <br />$17,000.00 100.00% <br />- <br />$10,000.00 100.00% <br />- <br />$41,000.00 100.00% <br />- <br />$28,000.00 100.00% <br />RETAINAGE (IF <br />VARIABLE RATE) <br />$1,500.00 <br />$400.00 <br />$4,200.00 <br />$1,300.00 <br />$265.00 <br />$210.00 <br />$850.00 <br />$500.00 <br />$2,050.00 <br />$1,400.00 <br />Material <br />11 <br />Footings & Foundation Labor <br />$415,000.00 <br />$415,000.00 <br />- <br />$415,000.00 <br />100.00% <br />$20,750.00 <br />12 <br />Footings & Foundation Material <br />$210,000.00 <br />$210,000.00 <br />- <br />$210,000.00 <br />100.00% <br />$10,500.00 <br />13 <br />Above Grade CMU Labor <br />$812,000.00 <br />$812,000.00 <br />- <br />$812,000.00 <br />100.00% <br />$40,600.00 <br />14 <br />Above Grade CMU Material <br />$348,000.00 <br />$348,000.00 <br />- <br />$348,000.00 <br />100.00% <br />$17,400.00 <br />15 <br />Slab on Grade Labor <br />$236,000.00 <br />$236,000.00 <br />- <br />$236,000.00 <br />100.00% <br />$11,800.00 <br />16 <br />Slab on Grade Material <br />$210,000.00 <br />$210,000.00 <br />- <br />$210,000.00 <br />100.00% <br />$10,500.00 <br />17 <br />Slab on Deck Labor <br />$140,000.00 <br />$140,000.00 <br />- <br />$140,000.00 <br />100.00% <br />$7,000.00 <br />18 <br />Slab on Deck Material <br />$69,000.00 <br />$69,000.00 <br />- <br />$69,000.00 <br />100.00% <br />$3,450.00 <br />19 <br />Stoops Labor <br />$8,000.00 <br />$8,000.00 <br />- <br />$8,000.00 <br />100.00% <br />$400.00 <br />20 <br />Stoops Material <br />$2,000.00 <br />$2,000.00 <br />- <br />$2,000.00 <br />100.00% <br />$100.00 <br />21 <br />Stone at Fireplace Labor <br />$8,000.00 <br />$8,000.00 <br />- <br />$8,000.00 <br />100.00% <br />$400.00 <br />22 <br />Stone at Fireplace Material <br />$2,000.00 <br />$2,000.00 <br />- <br />$2,000.00 <br />100.00% <br />$100.00 <br />23 <br />Concrete Allowance <br />$50,000.00 <br />$42,000.00 <br />$1,700.00 <br />- <br />$43,700.00 <br />87.40% <br />$6,300.00 <br />$2,185.00 <br />24 <br />Masonry Allowance <br />$40,000.00 <br />$40,000.00 <br />- <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />25 <br />Field House Labor <br />$70,000.00 <br />$70,000.00 <br />- <br />$70,000.00 <br />100.00% <br />$3,500.00 <br />26 <br />Field House Material <br />$18,000.00 <br />$18,000.00 <br />- <br />$18,000.00 <br />100.00% <br />$900.00 <br />27 <br />Bond <br />$43,500.00 <br />$43,500.00 <br />- <br />$43,500.00 <br />100.00% <br />$2,175.00 <br />PAYMENT TOTALS <br />1 $2,923,223.00 <br />$2,888,223.00 <br />$28,700.00 <br />- <br />$2,916,923.00 <br />99.78%1 <br />$6,300.00 <br />$145,846.15 <br />Page 1 of 2 <br />