My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. PCSR 09-22-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
09-22-2020
>
4.4. PCSR 09-22-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 2:40:19 PM
Creation date
9/16/2020 2:36:31 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Amendment <br /> Sec. 30-804. -Wind turbines. <br /> (h) General requirements. <br /> (1) S�n�. No signage or advertising of aay kind shaU be pertrtitted on the tower or a <br /> associated s"ttetttres. <br /> {2}a�—Climbing apparatus. All climbing apparatus shall be located at least 12 feet above the <br /> ground, and the tower must be designed to prevent climbing within the first 12 feet. <br /> {�42�— Ylind access easements. The enactment of this section does not constitute the granting <br /> of an easement by the city. The owner/operator shall be responsible for acquiring any <br /> covenants, easements, or similar documentation to assure sufficient wind to operate the <br /> wind turbine. <br /> {4}43)--Abandoned toners. If the wind turbine has not operated for a period of six successive <br /> months, or fails to meet the conditions of this section, the city council may order it <br /> dismantled and the site restored to its original condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.