My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 PRSR 09-09-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2020
>
09-08-2020
>
7.1 PRSR 09-09-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 1:07:14 PM
Creation date
9/4/2020 1:06:55 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/9/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hillside Park Singletrack & MORC Partnership Activities, 2020 <br /> <br /> <br />Trail Improvement Planning for 2020 <br /> <br />Timeline: <br /> November 2019 – MORC volunteers from Hillside Park and Bertram Chain of Lakes in Monticello <br />(these trails share many of the same volunteers) met to identify trail needs and improvement <br />opportunities at both parks. <br /> December 2019 - The Hillside trail stewards met with Elk River Parks to communicate these plans, and <br />discuss park business including the CSAH 12 construction project. <br /> May 2020 – Feature plan options were presented to park staff, some materials provided by the city. <br /> July 2020 – present: The volunteers execute the plan for 2020 work on the trail. <br /> <br />Trail Work Prioritization: <br />The volunteer group discussed the main priority was to mitigate and resolve the identified three significant <br />issues (below) and to keep up general maintenance. Additionally, based on feedback and rider demand, the <br />group discussed building some smaller challenge features as time and resources allowed. <br /> <br />What is a trail feature? <br />A trail feature is something that is engineered or constructed to manipulate the natural environment for a given <br />purpose. It may be dirt, rock, or a wooden structure. It may be used to address or prevent erosion, corral or <br />guide riders away from sensitive areas, provide a technical challenge to riders, or help communicate the <br />difficulty level at the entrance of a trail area. Constructed technical challenge features on singletrack trails are <br />indicated with the same rating system as ski trails (green circle = beginner, blue square = intermediate, black <br />diamond = advanced). In areas not marked as “advanced/most difficult”, constructed features are built to be <br />optional to ride, and not mandatory to ride for trail users to continue on the trail. MORC volunteers have not <br />installed any mandatory technical challenge structures at Hillside City Park. <br /> <br />Other Definitions: <br /> Trail Tread – the compacted surface of the singletrack trail. <br /> Dirt Grade Reversal – mounds of dirt for erosion control to keep water off the trail tread, can also <br />enhance rider experience. <br /> Armoring – the use of rock(s) in areas to reinforce dirt and assist in erosion control. <br /> Dirt Boss – Certified trail workers who have training and expertise in sustainable trail standards. <br /> Trail Steward - Dirt Bosses who also assist with park master planning, trail projects and volunteer <br />coordination. <br />
The URL can be used to link to this page
Your browser does not support the video tag.