My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 09-08-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
09-08-2020
>
4.5. SR 09-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:22:16 PM
Creation date
9/3/2020 4:12:51 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Assumptions <br /> <br />• The actions outlined in this work plan are consistent with the DNR Blanding’s turtle <br />fact sheet and flyer to protect Blanding’s turtles during the construction of the Lake <br />Orono Restoration and Enhancement (LORE) Project. <br /> <br />• The project is anticipated to take place from September 2020 (lake draw-down) to <br />April 2021 (work complete, lake rebound). No surveys are anticipated for spring <br />2021, as the work will conclude prior to melt conditions, and the lake will re-fill <br />naturally eventually to the normal pool elevation above the dam. <br /> <br />• City of Elk River staff will perform monitoring for Blanding’s Turtles September 15 of <br />in post dewatering monitoring for Blanding’s Turtles until project construction begins. <br /> <br />• Permit fees for turtle relocation if needed is not included in this proposal of services. <br /> <br /> <br /> <br />