My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-27-2020 PRSR
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2020
>
08-27-2020 Special
>
08-27-2020 PRSR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2020 3:02:56 PM
Creation date
8/28/2020 3:02:07 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
8/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orono ParkPreliminary Cost EstimateCity of Elk River, MNSRF Consulting Group, Inc.Project No. 136738/6/2020Beach Access Node-Ramps with Railings $20,000-Site Furnishings $18,000-Shade StructuresX$40,000-Retaining Walls $60,000Park Entrance Plaza-Concrete Walks $60,000-Site Furnishings $24,000Buildings/Shelters-Restroom/Consessions with Shelter $578,000-Small Watercraft Rental Area $20,000-Existing Shelter Improvements (3 Shelters)X$75,000Landscaping/Turf Establishment/Irrigation-Seed/Sod$40,000-Irrigation (connect to existing system) $25,000-Shrubs, Perennials, and Grasses $50,000-Coniferous and Deciduous Trees $25,000Lighting-Park Drive$50,000-Parking Lots $70,000-TrailsX$20,000$60,000-Sand Volleyball CourtsX$45,000-Basketball CourtX$25,000-Pickleball CourtsX$45,000Estimated Subtotal$2,739,000 $440,000 $356,000Contingency (10%)$273,900 $44,000 $35,600Total Estimated Construction Costs with 10% Contingency *$3,012,900 $484,000 $391,600Page 2 of 3
The URL can be used to link to this page
Your browser does not support the video tag.