My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. EDSR 08-17-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
08-17-2020
>
7.1. EDSR 08-17-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2020 10:29:45 AM
Creation date
8/14/2020 10:25:40 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
8/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o One (1) hard copy of all required drawings at a scale no smaller than 1" = 50', and no larger <br /> than 24"x36" <br /> o Two (2) sets of hard copies of all required drawings at 11"x17" <br /> o Provided in a digital format (e.g. .pdf, Jpeg, .doc, Awg) at a resolution of at least 300 dpi. <br /> Flash drives, CDs, and email are acceptable. <br /> o Folded (rolled drawings will not be accepted) <br /> ❑ All other information as determined by city staff <br /> In order for an application to be considered complete,all required information must be submitted <br /> by the application deadline. In accordance with state statute X15.99, subd. 3,the city is required to <br /> notify an applicant within 15 business days if information is missing. Complete applications will be <br /> processed in accordance with MN Statutes Chapter 462.358. <br /> I understand if all of the required/requested information is not submitted within 15 calendar days after my application has been <br /> submitted, this application will be returned incomplete and the next application deadline will be the follow ing month. <br /> Applicant Signature: Date: <br /> Print Name: <br /> Description of Project Narrative <br /> The narrative is your opportunity to describe,promote,and sell your proposal to the Planning <br /> Commission and/or City Council before the meeting(s). A typewritten narrative explaining your <br /> request in detail should include,but not limited to,all the following applicable information: <br /> ■ Detailed description/scope of project. <br /> ■ What is being proposed? <br /> ■ How is the request consistent with City of Elk River Comprehensive Plan? <br /> ■ Hours of Operation <br /> ■ Number of Employees <br /> ■ Number of parking stalls, existing and additional <br /> ■ Is there proposed screening of the site? <br /> ■ Proposed building materials <br /> ■ How do they comply with applicable design standards? <br /> ■ Signage— (at time of installation, a separate permit is required for each sign <br /> ■ How many? <br /> ■ Proposed sizes? <br /> ■ Locations? <br /> ■ What type? <br /> ■ Is there outdoor storage? <br /> Page 2 (Last Modified 8/7/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.