My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. EDSR 08-17-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2020
>
08-17-2020
>
7.1. EDSR 08-17-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2020 10:29:45 AM
Creation date
8/14/2020 10:25:40 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
8/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This page is for the applicant's reference,it does not need to be submitted. <br /> Building and Model Home Permits <br /> Building Permits <br /> The City of Elk River has adopted the following policy regarding the issuance of building permits in <br /> new plats. Building permits will not be accepted for review and issuance until the following items <br /> have been submitted, approved and/or completed to the City's satisfaction: <br /> • Developer agreement executed and recorded. <br /> • Final plat recorded. <br /> • All fees (park,surface water management, sealcoating,engineering escrow) relating to platting paid. <br /> • Letter of Credit received. <br /> • Grading completed. <br /> • Utilities installed and tested. <br /> • Streets installed with first lift of blacktop,curb&gutter. (See model permit requirements for <br /> exceptions). <br /> • Development plan approved. <br /> • Erosion control measures established. <br /> • Street name and traffic control signs installed. <br /> Model Home Permits <br /> Applications for model permits will be accepted at a rate of three (3) permits for every 50 homes <br /> within a plat. The City Engineer and the Fire Chief will approve model sites. In order to receive a <br /> model permit,the builder/developer must complete the attached agreement at the time of <br /> application. Model permit applications will be accepted after the following items have been <br /> submitted,approved and/or completed to the City's satisfaction: <br /> • Developer agreement executed and recorded. <br /> • Final plat recorded. <br /> • All fees (park,surface water management, sealcoating,engineering escrow) relating to platting paid. <br /> • Letter of Credit received. <br /> • Grading completed. <br /> • Streets graveled or access provided by an existing road. <br /> • Development plan approved. <br /> • If the model will be open to the public prior to completion of the streets,traffic control signs must <br /> be installed. <br /> Page 5 (Last Modified 8/7/2020) <br />
The URL can be used to link to this page
Your browser does not support the video tag.