Laserfiche WebLink
PROJECT DESCRIPTION <br />This project included two phases of construction. The first involved the <br />construction of a two-story addition to the Burn Tower and concrete paving. <br />The second phase involved the construction of a classroom building which <br />included a training room, two offices, storage space and men's and women's <br />restrooms. <br />SERVICES PROVIDED <br />Pre -Construction, Construction Management: <br />• Cost Estimating <br />• Value Engineering <br />• Life Cycle Cost Analysis <br />• Bid Package Development <br />• Bidding <br />• Construction Coordination Administration <br />• Scheduling <br />6,385 sf <br />2014 & 2015 (Two -Part Project) <br />2015 <br />$1.3 M <br />$1.26M <br />Design -Bid -Build <br />Amount: $36,900 (3.9%) <br />Schedule Impacts: No <br />46 CITY OF ELK RIVER I Elk River Public Safety Building Expansion and Elk River Fire Station #3 <br />