My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-17-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
08-17-2020
>
8.1. SR 08-17-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2020 10:00:26 AM
Creation date
8/14/2020 7:57:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION <br />This project included two phases of construction. The first involved the <br />construction of a two-story addition to the Burn Tower and concrete paving. <br />The second phase involved the construction of a classroom building which <br />included a training room, two offices, storage space and men's and women's <br />restrooms. <br />SERVICES PROVIDED <br />Pre -Construction, Construction Management: <br />• Cost Estimating <br />• Value Engineering <br />• Life Cycle Cost Analysis <br />• Bid Package Development <br />• Bidding <br />• Construction Coordination Administration <br />• Scheduling <br />6,385 sf <br />2014 & 2015 (Two -Part Project) <br />2015 <br />$1.3 M <br />$1.26M <br />Design -Bid -Build <br />Amount: $36,900 (3.9%) <br />Schedule Impacts: No <br />46 CITY OF ELK RIVER I Elk River Public Safety Building Expansion and Elk River Fire Station #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.