My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-17-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
08-17-2020
>
8.1. SR 08-17-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2020 10:00:26 AM
Creation date
8/14/2020 7:57:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION <br />This project included construction of a new two-story facility that houses <br />five apparatus bays, offices, and lounge and support space for the fire <br />department. A clock tower was also built in the center of the structure with <br />large windows that bring natural light into the station. The fire station was <br />built after the City of Eagan selected to change their fire department from a <br />paid on -call model to a duty crew model where several volunteer firefighters <br />work dedicated shifts to allow response to more minor calls the department <br />receives as well. The station opened in the spring of 2017. <br />SERVICES PROVIDED <br />General Construction: <br />• Material Procurement <br />• Scheduling <br />• Logistics and Coordination <br />• Subcontractor Contract Management <br />• Value Engineering <br />15,272 sf <br />2017 <br />$5.5M <br />$4.9M <br />Design -Bid -Build <br />Amount: $237,000 (4.9 %) <br />Schedule Impacts: No <br />40 CITY OF ELK RIVER I Elk River Public Safety Building Expansion and Elk River Fire Station #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.