Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8B46-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />11 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: 07/17/20 <br />In tabulations below, amounts are stated to the nearest dollar. <br />PERIOD TO: <br />07/31/20 <br />Design Electric, Inc <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F G <br />H <br />WORK COMPLETED <br />j <br />MATERIALS TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED FROM PREVIOUS <br />j <br />PRESENTLY COMPLETED I <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE APPLICATION (D <br />;STORED NOT IN AND STORED TO <br />THIS PERIOD ( <br />G + C I <br />( ) = <br />FINISH C - G <br />( ) <br />VARIABLE RATE ) <br />i <br />+ E) <br />D OR E) DATE <br />1 <br />Electrical (CO #2) <br />$1,340.581 <br />$1,340.58 <br />$1,340.581 <br />100.00% 1 <br />$67.03 <br />1 <br />? Electrical (CO #3) <br />$1,582.00 <br />$1,582.00 <br />I <br />$1,582.00 <br />100.00% <br />$79A0 <br />1 <br />) Electrical (CO #4) <br />($24,378.00) i <br />($24,378.00) E <br />($24,378.00) <br />100.00% ` <br />($1,218.90) <br />1 <br />Electrical (CO #5) <br />($12,693 73) 3 <br />($12,693.73) <br />($12,693 73) ; <br />100.00% <br />i <br />($634.69) <br />1 <br />' Electrical (CO #6) <br />$396.52 <br />$396.52 1 <br />$396 52 <br />100.00% - <br />$19.83 <br />1 <br />Electrical (CO #7) <br />$2,162 06 I <br />$2,162.06 <br />$2 162 06 = <br />100.00% <br />$108.101 <br />1 <br />Electrical (CO #8) <br />$7,694 97 <br />$7,000.00 <br />$694.97 <br />$7,694.97 1 <br />100.00% <br />$384.75 <br />1 <br />Electrical (CO #10) <br />$5,773 48 I° <br />$5,773.48 <br />( $5,773.46 <br />100.00% <br />$288.67 <br />12 <br />Joist Work - Electrical (CO #9) <br />$24,561.00 l <br />$20,000.00 <br />$4,561.00 <br />$24 ,561.001 <br />100.00% <br />[ <br />$1,228.05 <br />1 <br />)Electrical (CO #7) <br />$1,036.41 � <br />$1,035.41 _ <br />- $1,035.41 = <br />100.00%= <br />$51.77 <br />1 <br />j Electrical (CO #7) <br />$12,342.68 [ <br />$12,342.68 3 <br />$12,342.68 , <br />100.00% <br />f <br />$617.13 } <br />1 <br />Electrical (CO #7) <br />$1,170 60 <br />$1,170.60 i <br />$1 170 60 <br />100.000% <br />f <br />$58.53 1 <br />1 <br />Electrical (CO #7) <br />($7,396 86) <br />($7,396.86)' <br />($7,396 86) <br />100.00% 1 <br />($369.84) <br />1 <br />Electrical (CO #11) <br />$42,232 20 € <br />$35,000.00 <br />$7,232.20 <br />$42 232.20 1 <br />100.00% <br />$2,111.61 <br />1 <br />`. Electrical (CO #12) <br />$12,952.00 1 <br />$10,000.00 <br />$2,952.00 <br />$12,952.00 ' <br />100.00%, <br />$647.60 ) <br />1 <br />Electrical (CO #13) <br />$1,677.13 i <br />$1,677.13 <br />_ <br />$1,677.13 <br />100.00% <br />$83.86 <br />i 1 <br />Electrical (CO #14) <br />$9,491.86 _ <br />$9,491.86 <br />1 <br />f Electrical (CO #15) <br />$1,044.26 E <br />$835.41 <br />€ $835411 <br />80.00% <br />$208.85 1 <br />$41.77 <br />11 <br />1 Electrical (CO #15) <br />$5,221.531 <br />$4,177.231 <br />$4,177.231 <br />80.00% <br />$1,044.301 <br />$208.86 <br />11 <br />[ Electrical (CO #16) <br />$3,536.881 <br />$2,829.50 <br />i $2,829.501 <br />80.00% _ <br />$707.38 1 <br />$141.48 1 <br />PAYMENT TOTALS ; <br />$1,877,606.06 C <br />$1,812,065.36 1 <br />$50,186.371 <br />- $1,862,251.73 i <br />99.18% , <br />$15,354.33 € <br />$93,112 58 <br />Page 2 of 2 <br />