Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E7614D8D-8B46-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />6 <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />APPLICATION DATE: 07/24/20 <br />PERIOD TO: <br />07/31/20 <br />Murphy <br />Window and Door Commercial, Inc <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />DESCRIPTION OF WORK SCHEDULED I FROM PREVIOUS <br />PRESENTLY <br />COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN I AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) <br />DATE <br />j <br />1 <br />08-900 Curtain Wall & <br />$147,882.52 = <br />$144,924.87 <br />$2,957.65 , <br />$147,882.52 j <br />100.00% <br />$7,394.13 <br />Storefront Metal <br />2 <br />08-700Hardware <br />i <br />$89,971.203 <br />$88,171.78 <br />$1,799.42 <br />$89,971.20 <br />100.00% j <br />$4,498.56 <br />3 <br />08-300 Automatic Entrances <br />$22,578.001 <br />$22,578.001 I <br />$22,578.00 <br />100.00% <br />] $1,128.90 <br />i 4 <br />08-800 Glazing I <br />$113,807.50 <br />$111,531.353 <br />$2,276.15 <br />! <br />$113,807.50) <br />I <br />100.00% <br />$5,690.38 <br />I <br />5 <br />08-950 Brake Metal <br />$71100.00 <br />$6,958.00 ] <br />$142.00 <br />- <br />$7,100.00 <br />100.00% <br />$355.00 <br />6 <br />07-900 Joint Sealers <br />$3,675.73 <br />$3,602.22 j <br />$73.51 <br />-' <br />$3,675.73 <br />100.00% [', <br />$183.79 <br />7 <br />08-050 Misc Fasteners, <br />$3,944.65 <br />$3,865.76 <br />$78.891 <br />$3,944.65 <br />100.00%1 <br />$197.23 <br />Shims, Backer Rod <br />8 <br />01-542 Man Lifts, Storage, & <br />$25,560.00. <br />$25,048.801 <br />$511.20 <br />- <br />$25,560.00 <br />100.00% <br />$1,278.00 <br />i <br />Equipment <br />9 <br />01-750 Bonds & Insurance f <br />$14,200.00 <br />$14,200.00 <br />-I <br />$14,200.00� <br />100.00% <br />$710.00 <br />10 <br />01-010 Refundable Allowance <br />$7,500.00 <br />$7,500.00 <br />- <br />- <br />$7,500.00 <br />100.00% <br />$375.00 <br />ill <br />08-910 Shop Drawings <br />- <br />$9,958.00 <br />$9,958.00 <br />- <br />$9,958.00 = <br />100.00% <br />-, $497.90 <br />f 12 <br />08-920 Structural Calcs ) <br />$17,569.20 _ <br />$17,569.20 <br />- <br />$17,569.201 <br />100.00%) <br />- $878.46 <br />113 <br />108-930 Field Installation Labor <br />$119,253.20 <br />$116,868.14 <br />$2,385.06 <br />$119,253.20 I <br />100.00%' <br />- $5,962.66 <br />14 <br />E 01-770 Mobilization 1 <br />$18,000.00 _ <br />$18,000.00 <br />- <br />$18,000.00 <br />100.00% _ <br />-$900.00 <br />1 <br />I Glass and Glazing (CO #1) <br />$43,100.00 <br />$43,100.00 <br />$43,100.00 E <br />100.00% <br />- $2,155.00 <br />=1 <br />1 Glass and Glazing (CO #2) <br />($4,000.00) 1 <br />($4,000.00) <br />- <br />($4,000.00) k <br />100.00% <br />- ($200.00) <br />s 1 <br />` Glass and Glazing (CO #2) <br />($7,500.00) 1 <br />($7,500.00) <br />- <br />? <br />($7,500.00) € <br />100.00% <br />- <br />? 1 <br />Glass and Glazing (CO #3) <br />$950 00 1 <br />$950.00 <br />$950.001 <br />100.00% <br />$47.50 <br />1 <br />Glass and Glazing (CO #4) <br />$7,800.00 ` <br />$7,800.00 <br />$7,800.001 <br />100.00% - <br />$390.00 <br />1 <br />_ Glass and Glazing (CO #5) <br />$450.00 <br />$450.00 <br />$450.00 = <br />100.00% - <br />( $22.50' <br />PAYMENT TOTALS <br />$641,800.00 <br />$622,376.12 1 <br />$19,423.88( <br />$641,800.001 <br />100.00%1 <br />-? $32,090.01 <br />Page 1 of 1 <br />