Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8B46-447BC430C75D <br />,CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />2 <br />containing Contractor's signed Certification <br />is attached. <br />APPLICATION DATE: 07/22/20 <br />In tabulations below, amounts are stated <br />to the nearest dollar. <br />PERIOD TO: <br />07/31/20 <br />Schwickert's Tecta America, LLC <br />PROJECT <br />NO.: <br />19520-0033 <br />A <br />B <br />- <br />C <br />- - <br />D <br />E F <br />G <br />H <br />I <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />ITEM <br />NUM <br />DESCRIPTION OF WORK j <br />SCHEDULED ; FROM PREVIOUS <br />VALUE <br />PRESENTLY <br />STORED IN <br />COMPLETED <br />AND STORED TO <br />% <br />+ C) <br />BALANCE TO <br />FINISH <br />RETAINAGE (IF <br />APPLICATION <br />(D <br />THIS PERIOD (NOT <br />(G <br />(C - G) <br />;VARIABLE RATE) <br />+ E) <br />D OR E) <br />_ DATE <br />3 <br />I 1 <br />; Insurance/Bonds <br />$12,574 00 i <br />$12,574.00 <br />- <br />- $12 574 00 � <br />100.00% <br />l <br />- f $628.70 <br />2 <br />= Shop Drawings <br />$11,211.001 <br />$11,211.00 € <br />- $11 211 00 % <br />100.00%, <br />$560.55 <br />3 <br />Mobilzation/Equipment <br />$11,710.001 <br />- <br />$11,710.00 <br />-_ $11,710.00 <br />100.00% <br />' $585.50' <br />4 <br />'Safety <br />$9,311.00 <br />$9,311.00 <br />$9,311.00' <br />100.00% <br />$465.55 <br />5 <br />iWall Insulation/Z-Furring <br />$10,888.001 <br />$10,888.00 <br />$10 888 001 <br />100.00%' <br />$544.40 <br />Materials 3 <br />6 <br />= Wall Insulation/Z-Furring Labor 1 <br />$9,646 00 € <br />$9,646.00 <br />- $9 646 00 <br />100.00% <br />$482 30 <br />7 <br />) Solid Phenolic Rainsceen <br />$33,465.001 <br />$33,465.00 <br />$33,465.00 i <br />100.00% <br />k $1,673.25 <br />Panels Materials <br />. 8 <br />Solid Phenolic Rainsceen <br />$11,282.001 <br />$11,282.00 <br />- $11,282.001 <br />100.00%, <br />$564.10 <br />;Panels Labor <br />9 <br />x Solid Phenolic Rainscreen <br />i <br />$17,619 00 I <br />$17,619.00 <br />- $17 619 00' <br />100.00% <br />[ $880.95 <br />i Panel Flashing Materials <br />110 <br />Solid Phenolic Rainscreen <br />$8,113.00 <br />$8,113.00 <br />$8,113.00 I <br />100.00%- <br />$405.65 <br />Panel Flashing Labor j <br />ill <br />s ACM Fabrication Materials <br />$20,003 00 r <br />$20,003.00 <br />- $20 003 001 <br />100.00% 1 <br />E $1,000.15 <br />.12 <br />ACM Fabrication Labor <br />$17,519 00 <br />$17,519.00 <br />- ` $17 519 00 I <br />100.00% 3 <br />$875.95 <br />13 <br />ACM Flashing Materials <br />$5,419 00 1 <br />$5,419.00 <br />$5,419.00 j <br />100.00%; <br />$270.95" <br />14 <br />€ ACM Flashing Labor <br />$4,923 00 ` <br />$4,923.00 <br />- $4,923.001 <br />100.00% 1 <br />$246.15 <br />15 <br />ACM Inst. Materials hat <br />( <br />$7 241.00 i <br />, <br />$7 241.00 <br />- 7 241.00 I <br />$ <br />100.00% <br />$362.05 <br />j <br />/fasteners/etc.) <br />16 <br />ACM Inst. Labor <br />$6,491 001 <br />$6,491.00 <br />- $6 491 00 <br />100.00% <br />j <br />$324.55 ] <br />17 <br />1 $5,000 Allowance per Contract <br />$5,000.00 „ <br />$5,000.00 <br />- $5,000.00 i <br />100.00% <br />$250.00 I <br />1 <br />I <br />Metal Wall Panels (CO #1) ? <br />($10,955.00) <br />- <br />($10,955.00) <br />($10,955.00) ] <br />100.00% € <br />($547.75) <br />1 <br />j Metal Wall Panels (CO #2) <br />$5,315 36 <br />- <br />$5,315.36 <br />$5,315.361 <br />100.00% E <br />$265.77 <br />1 <br />Metal Wall Panels (CO #3) <br />($5,000.00) <br />- <br />($5,000.00) <br />($5,000.00) <br />100.00% ` <br />- ($250.00) <br />1 <br />Metal Wall Panels (CO #4) i <br />($5,602.75) <br />- <br />($5,602.75) <br />($5,602.75) <br />100.00% E <br />3 ($280.14) <br />PAYMENT TOTALS <br />$186,172.61 ' <br />$23,785.00' <br />$162,387.611 <br />$186,172.611 <br />100.00% <br />$9,308 631 <br />Page 1 of 1 <br />