Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-81346-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />9 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />07/22/20 <br />In tabulations below, amounts are stated <br />to the nearest dollar. <br />PERIOD TO: <br />07/31/20 <br />Top -All Roofing, Inc <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F G <br />H <br />I <br />' <br />WORK COMPLETED <br />MATERIALS TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED ' FROM PREVIOUS <br />PRESENTLY COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN AND STORED TO ' <br />(G + C) i <br />FINISH (C - G) <br />VARIABLE RATE) <br />4 <br />' <br />+ E) <br />D OR E) DATE <br />1 <br />I Material Insulation <br />$384,950.00 <br />$384,950.00 f <br />- t $384,950.00 <br />100.00% <br />$19,247.50 <br />2 <br />Material Vapor Barrier <br />$50,600 00 <br />$50,600.00 E <br />- <br />I $50,600.00 <br />100.00% <br />$2,530.001 <br />3 <br />= Material EPDM & Accessories <br />$195,960.00 <br />$195,960.00 i <br />$195,960.00 j <br />100.00% <br />$9,798.00 <br />4 <br />Material Sheet Metal <br />$32,040.00 <br />$32,040.00 1 <br />- <br />- I $32,040.00 <br />100.00% <br />$1,602.00 3 <br />5 <br />Labor Insulation <br />$80,070.00 ; <br />$80,070.00 ` <br />- <br />$80,070.00 j <br />100.00% E <br />$4,003.50 <br />16 <br />i Labor Vapor Barrier <br />$21,110.001 <br />$21,110.00 r <br />-_ <br />$21,110.00 <br />i <br />100.00%1 <br />$1,055.50 <br />7 <br />I Labor EPDM &Accessories <br />$148,060.00 <br />$148,060.00 i <br />- <br />$148,060.00 ] <br />100.00% ; <br />$7,403.00 <br />8 <br />Labor Sheet Metal <br />$29,900.00 <br />$29,900.00 E <br />- <br />- $29,900.00? <br />100.00% <br />$1,495.00 <br />9 <br />' Allowance for Conditions <br />$45,000.00 ; <br />$45,000.00 € <br />- <br />- $45,000.00 <br />100.00% <br />$2,250.00 <br />10 <br />' Bonding <br />$33,000.00' <br />$33,000.00 <br />- <br />- $33,000.00 <br />100.00% <br />$1,650.00 <br />1 <br />:Roofing (CO #1) <br />$2,060 00 <br />$2,060.00 <br />- $2,060.00 <br />100.00%1 <br />$103.00 3 <br />1 <br />' Roofing (CO#2) <br />($12,00000) <br />($12,000.00) <br />-3 <br />- ($12,000.00)? <br />100.00% <br />, <br />($600.00) <br />1 <br />Roofing (CO #3) <br />$1,560 00 ` <br />$1,560.00 i <br />- <br />- $1,560.00 <br />100.00%1 <br />$78.00 <br />1 <br />'Roofing (CO #4) <br />($12,208 62) i <br />($12,208.62) € <br />- <br />($12,208.62) <br />100.00% <br />($610.43) <br />1 <br />Roofing (CO #5) <br />$470.00 I <br />$470.00 f <br />- $470 00 ; <br />100.00% <br />i $23.50 <br />1 <br />Roofing (CO #6) <br />($2,000.00) € <br />($2,000.00) ` <br />- ($2,000 00) <br />100.00% <br />($100.00) j <br />1 <br />° Roofing (CO #7) <br />$220 00 G <br />$220.00 <br />- $220 00 <br />100.00% <br />$11.00 <br />1 <br />Roofing (CO #8) <br />$4,637 00 <br />- <br />$4,637.00 <br />- $4,637.00 <br />100.00% 1 <br />$231.85 l <br />PAYMENT TOTALS j <br />$1,003,428 38 <br />$998,571.38 <br />$4,857.001 <br />$1,003,428.38 <br />100.00% [ <br />- $50,171.42 <br />Page 1 of 1 <br />