Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8B46-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />9 <br />containing Contractors signed Certification <br />is attached. <br />APPLICATION DATE: <br />07/27/20 <br />In tabulations below, amounts are stated <br />to the nearest dollar. <br />PERIOD TO: <br />07/31/20 <br />High Five Erectors II, Inc. <br />PROJECT <br />NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F I G <br />H <br />WORK COMPLETED <br />MATERIALS TOTAL <br />ITEM <br />j DESCRIPTION OF WORK <br />SCHEDULED FROM PREVIOUS <br />PRESENTLY COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN , AND STORED TO i <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) DATE <br />1 <br />051200 Structural Steel <br />$129,841.001 <br />$129,841.00 <br />$129,841.00 <br />100.00% <br />$6,492.05 . <br />2 <br />052100 Steel Joists <br />$100,523.00 l <br />$100,523.00 i$100,523.00 <br />100.00% <br />$5,026.15 <br />3 <br />' 053100 Steel Decking <br />$45,888.00 <br />$45,888.00 <br />] <br />( $45,888.00 <br />100.00%' <br />$2,294.40 <br />4 <br />055000 Metal Fabrications <br />$8,508.00 <br />$8,508.001 <br />_ <br />i $8 508 001 y <br />100.00% <br />$425.40 <br />5 <br />055100 Metal Pan Stairs <br />$43,996.00 <br />$43,996.00 <br />( $43 996 00 <br />100.00% <br />$2,199.80 <br />6 <br />055213 Pipe 1£ Tube Railings <br />$71,614.00 <br />$71,614.00 <br />j <br />$71 614 00 <br />100.00% <br />F $3,580.70 <br />7 <br />Allowance <br />$30,000.00 <br />$29,696.15 <br />$303.85 i, <br />$30,000.00 = <br />100.00% <br />- [ $1,500.00 <br />8 <br />;Bond <br />$5,380.00 E <br />$5,380.00 <br />- <br />$5,380.00 <br />100.00% <br />- $269.00 <br />1 <br />Structural Steel Erection (CO 3 <br />$4,190 00 11 <br />$4,190.00 <br />z <br />$4 190 00 ` <br />100.00% _ <br />$209.50 <br />#1) <br />1 <br />Structural Steel Erection (CO <br />($6,888 15) <br />($6,888.15) <br />-� <br />($6,888.15) <br />100.00%i <br />- ($344.41)1 <br /># <br />C 1 <br />;Structural Steel Erection (CO <br />$500.00 _ <br />$500.00 _ <br />- <br />- $500.00 <br />100.00% <br />$25.00 <br />#3) <br />x 1 <br />Structural Steel Erection (CO <br />$672.001 <br />$672.00 <br />- <br />- _ $672.00 = <br />100.00% <br />- $33.60 <br />I #4) <br />€ <br />1 <br />Structural Steel Erection (CO <br />$3,000.00 <br />$3,000.00- <br />- <br />-- $3,000.00 <br />100.00%a <br />- $150.00 <br />#5) <br />1 <br />Structural Steel Erection (CO <br />$8,650.00 <br />$8,650.00 - <br />- <br />- _ $8,650.00 <br />100.00% <br />- $432.50 <br />#6) <br />1 <br />E Structural Steel Erection (CO <br />$600.00 <br />$600.00 <br />- <br />$600.00 E <br />100.00%' <br />- $30.00 <br />I <br />£ #7) <br />s <br />I <br />I 1 <br />Structural Steel Erection (CO <br />$1,200.00 <br />$1,200.00 ° <br />- <br />-_ $1,200.00 E <br />100.00% <br />- $60.00 <br />#7) <br />1 <br />Structural Steel Erection (CO <br />$3,040.00' <br />$3,040.00 <br />- <br />-_ $3,040.00 € <br />100.00%- <br />- $152.00 <br />#8) <br />1 <br />[Structural Steel Erection (CO <br />$1,752.00_ <br />-? <br />$1,752.00 <br />$1,752.001 <br />100.00%1 <br />-? $87.60 <br />#9) <br />1 <br />Structural Steel Erection CO <br />( <br />($303.85) <br />- <br />($303.85) <br />- _ ($303.85) i <br />100.00% 1 <br />- ($15.19) <br />#10) <br />1 <br />e Structural Steel Erection (CO <br />$4,217.00 _ <br />- ( <br />$4,217.00 <br />- $4,217.00 <br />100.00% 3 <br />- $210.85 <br />#10) <br />] <br />( PAYMENT TOTALS ! <br />$456,379.00 <br />$450,410.00 <br />$5,969.00 <br />$456,379.00 <br />100.00% <br />- 3 $22,818.95 <br />Page 1 of 2 <br />