Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8B46-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />11 <br />containing Contractor's signed Certification <br />is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />APPLICATION DATE: <br />07/17/20 <br />PERIOD TO: <br />07/31/20 <br />Design Electric, Inc <br />PROJECT <br />NO.: <br />19520-0033 <br />A <br />B <br />C <br />D <br />E <br />F G <br />H <br />WORK COMPLETED <br />MATERIALS TOTAL <br />ITEM <br />NUM <br />DESCRIPTION OF WORK <br />SCHEDULED <br />VALUE :APPLICATION <br />FROM PREVIOUS <br />THIS <br />PRESENTLY COMPLETED <br />STORED (NOT IN AND STORED TO <br />% I <br />(G + C) <br />BALANCE TO <br />FINISH (C - G) <br />RETAINAGE (IF <br />VARIABLE RATE) <br />(D <br />+ E) <br />PERIOD <br />D OR E) DATE <br />Electrical (CO #2) <br />$1,340.58 <br />$1,340.58 i <br />- <br />$1,340.58 <br />100.00% i <br />$67 03 <br />I Electrical (CO #3) i <br />$1,582.00 <br />1 <br />$1,582.00 <br />$1,582.00 <br />100.00% <br />, <br />$79.10 <br />1 <br />Electrical (CO #4) j <br />_ <br />($24,378.00) <br />($24,378.00) <br />3 ($24,378.00) <br />100.00% <br />($1,218.90) <br />1 <br />Electrical (CO #5) <br />($12,69173) _ <br />($12,693.73) ? <br />($12,693.73)' <br />100.00% 1 <br />($634.69) <br />1 1 <br />Electrical (CO #6) <br />$396.52 <br />$396.52 <br />$396.52':. <br />100.000/0 <br />$19.83 <br />1 <br />Electrical (CO #7) <br />$2,162.06 <br />$2,162.06 <br />$2,162.06 E <br />100.000 <br />$108.10 <br />1 <br />Electrical (CO #S) <br />$7,694.97 <br />$7,000.00 <br />$694.97 <br />? $7,694.97 <br />100.00% <br />$384.75 <br />1 <br />Electrical (CO #10) <br />$5,773.48 <br />$5,773.48 <br />$5,773.481 <br />100.00%' <br />$288.67 <br />2 <br />Joist Work ffi[efr€e, (CO #9i <br />$24,561.00 <br />$20,000.001 <br />$4,561.00 <br />$24,561.00 <br />100.00% 1 <br />$1,228.05 <br />1 <br />Electrical (CO #7) <br />$1,035.41 ' <br />$1,035.41 <br />( <br />$1,035.41 ` <br />100.00% j <br />$51.77 <br />1 <br />Electrical (CO #7) <br />$12,342.68 <br />$12,342.68 <br />$12 342 68 I <br />100.00% <br />$617.13 <br />t <br />Electrical (CO #7) <br />$1,170.60 ° <br />$1,170.60 <br />$1 170 60 , <br />100.00% <br />$58.53 <br />1 <br />Electrical (CO #7) <br />($7,396.86) <br />($7,396.86) <br />($7,396 86) ` <br />100.00% <br />($369.84) I <br />Electrical (CO #11) <br />$42,232.20 s <br />$35,000.00 <br />$7,232.20 <br />$42 232 20 <br />100.00% 3 <br />$2,111.61 ' <br />1 <br />Electrical (CO #12) <br />$12,952 00 <br />$10,000.00 <br />$2,952.00 <br />$12 952.00 ` <br />100.00% <br />$647.60 <br />Electrical (CO #13) <br />$1,677.131 <br />$1,677.13 <br />- $1 677 13 ; <br />100.00% <br />$83.86 , <br />1 <br />E Electrical (CO #14) <br />$9,491 86 <br />_ <br />$9,491.86 <br />Electrical (CO #15) <br />$1,044 26 <br />$835.41 <br />$835 41 ;,, <br />80.00% <br />$208.85 <br />$41.77 1 <br />'Electrical (CO #15) <br />$5,221 53; <br />$4,177.23 <br />- $4,177.231 <br />80.00% <br />$1,044.301 <br />$208.86 <br />1 <br />Electrical (CO #16) <br />$3,536.88 <br />- <br />$2,829.50 L <br />$2,829.50 j <br />80.00% _ <br />$707.381 <br />$141.48 <br />PAYMENT TOTALS; <br />$1,877,606.06 <br />$1,812,065.36 <br />$50,186.371 <br />$1,862,251.731 <br />99.18%. <br />$15,354.33 <br />$93,112581 <br />Page 2 of 2 <br />