My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-2020 HRA MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Minutes
>
2020-2029
>
2020
>
07-06-2020 HRA MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2020 8:44:26 AM
Creation date
8/11/2020 8:44:03 AM
Metadata
Fields
Template:
City Government
type
HRM
date
7/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes Page 5 <br />July 6, 2020 <br />8.3 Main and Gates Redevelopment Findings of Fact <br />Ms. Othoudt presented the staff report. <br />Motion by Commissioner Chuba and seconded by Commissioner Ovall to adopt <br />Resolution 20-05 Finding Parcel is Occupied by Structurally Substandard Buildings <br />as outlined in the staff report. <br />Motion carried 4-0. <br />8.4 Main Street and Gates Redevelopment — Award Demolition Contract <br />Ms. Othoudt presented the staff report. <br />Chair Toth asked how the removal of asbestos would be handled. <br />Ms. Othoudt explained the asbestos removal would be handled under a separate contract <br />after the inspection was completed. <br />Motion by Commissioner Eder and seconded by Commissioner Chuba to authorize <br />the executive director to engage in a contract with Techtron Engineering, Inc. <br />Environmental Solutions for pre -demolition asbestos testing of buildings located at <br />414, 430, 420 Main Street NW, and 326 Gates Ave NW in an amount not to exceed <br />$2,600 and authorize the executive director and the chair to execute the contract in a <br />form acceptable to the HRA attorney, the chair and the executive director. <br />Motion carried 4-0. <br />Ms. Othoudt outlined the amounts of the submitted bids for demolition of five of the seven <br />properties as outlined in the staff report for the project as follows: <br />Turf Enterprise Incorporated: $140,130.00 <br />Steinbrecker Companies, Inc. $134,715.00 <br />Veit Specialty Contracting: $102,000.00 <br />Motion by Commissioner Eder and seconded by Commissioner Ovall to Authorize, <br />by motion, the executive director to engage in a contract for the demolition of <br />buildings located at 326 Gates Avenue NW, and 414, 420, 426 and 430 Main Street <br />NW, in addition to two accessory structures at 406 Main and 419 3rd Ave NW with <br />Veit Specialty Contracting in an amount not to exceed $102,000.00 and authorize the <br />executive director and the chair to execute the contract in a form acceptable to the <br />HRA attorney, the chair and the executive director. <br />Motion carried 4-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.