My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-2020 HRA MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Minutes
>
2020-2029
>
2020
>
07-06-2020 HRA MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2020 8:44:26 AM
Creation date
8/11/2020 8:44:03 AM
Metadata
Fields
Template:
City Government
type
HRM
date
7/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes <br />July 6, 2020 <br />Motion carried 4-0. <br />6. Open Forum <br />No one appeared for Open Forum. <br />7. Public Hearings <br />There were no public hearings. <br />8.1 HRA Housing Rehabilitation Loan Program Update <br />Ms. Othoudt presented the staff report. <br />8.2 Hillside Heights Apartments <br />Ms. Othoudt presented the staff report. <br />Chair Toth asked for clarification about there being two phases to this project and the <br />construction timeline. <br />Page 2 <br />Dan Walsh, representing Community Housing Development Company, explained the <br />building phases. He explained they will apply for low income tax credits this year, proceed <br />with formal design and the local approval process in 2021, and construction at this time next <br />year. He indicated the future phase will come after the first phase is completed, setting up <br />the site to work towards two phases but designing the first phase to be a standalone project <br />on its own should phase two not happen. <br />Chair Toth asked if the second phase will be a standalone project also. <br />Mr. Walsh stated they would construct a lot of the common amenities in the first phase, <br />such as the playground, and the second phase will have the same amenities inside the second <br />building with full service property management and maintenance staff, mirroring each other <br />across the site. <br />Commissioner Chuba asked which building would be built first of the two L-shaped <br />buildings. <br />Mr. Walsh indicated the building along Twin Lakes Road would be constructed first. <br />Commissioner Chuba stated he was looking at some of the promotional offerings created by <br />CHDC and felt they seem to promote the Northstar Commuter Rail Line as an important <br />amenity to this project. <br />Mr. Walsh stated the proximity of the project is important to the rail line as they are <br />transportation -focused with the rail station within a half -mile walk, using access of the <br />crosswalk and sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.