Laserfiche WebLink
CommonGround <br />AllianceCall 48 <br />Hoursbefore <br />digging:811 <br />orcall811.com12"MIN.LAST <br />REVISED:08/15/17MACHINESLICED <br />SILT <br />FENCE(HEAVYDUTY)GD03FLOWFLOW <br />RUNOFFNOTES: <br />1. <br />INSPECT <br />AND <br />REPAIR <br />FENCE <br />AFTER <br />EACH <br />STORM <br />EVENT <br />AND <br />REMOVE <br />SEDIMENT WHENACCUMULATED TO 1/2THEHEIGHTOFTHEFABRICORMORE.2.REMOVED <br />SEDIMENT SHALL BE DEPOSITED TO <br />AN AREA THAT <br />WILL NOT CONTRIBUTE <br />SEDIMENTOFF- <br />SITEANDCAN <br />BE PERMANENTLY STABILIZED. <br />3. <br />SILT <br />FENCE <br />SHALL BE PLACED <br />ON SLOPE CONTOURS TO MAXIMIZE <br />PONDING EFFICIENCY.4. <br />ALL ENDS OF THE SILT FENCE SHALL BE WRAPPED UPSLOPE <br />SO THE ELEVATION OF THE BOTTOM OF FABRIC IS HIGHER <br />THAN "PONDING HEIGHT".5."HEAVY DUTY" IS <br />SAME AS MACHINE SLICED ONLY <br />HAND INSTALLED. <br />WOVEN MONOFILAMENT (36" WIDE)FILTER FABRIC, ATTACHSECURELY TO UPSTREAMSIDE OF <br />POST WITH 3-50LBTENSILE STRENGTH PLASTICZIP-TIES PER <br />POSTWITHINTOP 8" OF FABRIC5' <br />STEEL T- <br />POSTFABRIC SLICED <br />INTOSOIL <br />WITHCOMPACTED <br />BACKFILL5' <br />STEEL T- <br />POST6'-