My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.0 SR 08-12-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
08-12-2020 SPECIAL (Joint with Planning Commission)
>
2.0 SR 08-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 9:50:35 AM
Creation date
8/7/2020 7:52:51 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 5: Comprehensive Plan Document and Adoption <br />Based on the previous steps in the planning process, the draft and final versions of the Comprehensive Plan document will <br />be presented for review and consideration as part of the adoption process. <br />5a: Prepare Draft Comprehensive Plan <br />Based on the work activities of Steps 1 through 4, a Draft <br />Comprehensive Plan document will be prepared for review and <br />consideration. The Draft Plan will be designed not only to serve as a <br />legal document for guiding land use, transportation, community facilities <br />and infrastructure, and the natural environment, but also as a guide for <br />establishing City policy regarding a variety of community components <br />that collectively improves the overall quality of life. <br />Based on the input received in Step 4, the draft Comprehensive Plan will <br />include the following chapters: <br /> •Community Background; <br /> •Land Use including Housing and Economic Development Framework <br />Plans; <br /> •Transportation and Mobility Plan; <br /> •Urban Service Area Plan; <br /> •Parks, Open Space, and Natural Resources Plan; and <br /> •Implementation. <br />5b: Implementation Strategy <br />An implementation strategy will be developed that identifies the lead <br />and supporting agencies, including City boards and commissions as well <br />as partner organizations, to ensure that each action has a designated <br />champion to ensure implementation. <br />The implementation strategy will include an Action Matrix that will <br />serve as a checklist to track implementation progress. The action <br />matrix will summarize the specific actions required to carry out the new <br />Comprehensive Plan, including recommendations regarding updates <br />to City ordinances including zoning and other regulations, annexation <br />and growth strategy, priority improvement projects and redevelopment <br />sites, potential funding sources and implementation techniques, as well <br />as general administration and follow-up to the Plan. This section will <br />provide metrics and other detail necessary to allow the City to track the <br />progress and effectiveness of the Plan and maximize its usefulness as a <br />tool to achieve community goals and objectives. <br />5c: Staff Review of Draft Comprehensive Plan <br />Prior to presenting the draft Plan to the Advisory Committee, the Plan <br />will be distributed to staff for review. The Plan will be modified based on <br />staff review before presentation to the Advisory Committee. <br />28 Comprehensive Plan Update | City of Elk River, Minnesota <br />Prepared by Houseal Lavigne
The URL can be used to link to this page
Your browser does not support the video tag.