My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. DRAFT HRA MINUTES 08-03-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
08-03-2020
>
4.1. DRAFT HRA MINUTES 08-03-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 8:31:19 AM
Creation date
7/31/2020 8:31:08 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
8/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes Page 5 <br /> July 6,2020 <br /> ----------------------------- <br /> 7.3 Main and Gates Redevelopment Findings of Fact <br /> Ms. Othoudt presented the staff report. <br /> Motion by Commissioner Chuba and seconded by Commissioner Ovall to adopt <br /> Resolution 20-05 Finding Parcel is Occupied by Structurally Substandard Buildings <br /> as outlined in the staff report. <br /> Motion carried 4-0. <br /> 7.4 Main Street and Gates Redevelopment — Award Demolition Contract <br /> Ms. Othoudt presented the staff report. <br /> Chair Toth asked how the removal of asbestos would be handled. <br /> Ms. Othoudt explained the asbestos removal would be handled under a separate contract <br /> after the inspection was completed. <br /> Motion by Commissioner Eder and seconded by Commissioner Chuba to authorize <br /> the executive director to engage in a contract with Techtron Engineering, Inc. <br /> Environmental Solutions for pre-demolition asbestos testing of buildings located at <br /> 414, 430, 420 Main Street NW, and 326 Gates Ave NW in an amount not to exceed <br /> $2,600 and authorize the executive director and the chair to execute the contract in a <br /> form acceptable to the HRA attorney, the chair and the executive director. <br /> Motion carried 4-0. <br /> Ms. Othoudt outlined the amounts of the submitted bids for demolition of five of the seven <br /> t <br /> as outlined in the staff report for the project as follows: <br /> urf Enterprise Incorporated: $140,130.00 <br /> embrecker Companies,Inc. $134,715.00 <br /> eit Specialty Contracting: $102,000.00 <br /> Motion by Commissioner Eder and seconded by Commissioner Ovall to Authorize, <br /> by motion, the executive director to engage in a contract for the demolition of <br /> buildings located at 326 Gates Avenue NW, and 414, 420, 426 and 430 Main Street <br /> NW, in addition to two accessory structures at 406 Main and 419 3rd Ave NW with <br /> Veit Specialty Contracting in an amount not to exceed $102,000.00 and authorize the <br /> executive director and the chair to execute the contract in a form acceptable to the <br /> HRA attorney, the chair and the executive director. <br /> Motion carried 4-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.