My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. DRAFT HRA MINUTES 08-03-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
08-03-2020
>
4.1. DRAFT HRA MINUTES 08-03-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 8:31:19 AM
Creation date
7/31/2020 8:31:08 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
8/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Housing and Redevelopment Minutes Page 2 <br /> July 6,2020 <br /> ----------------------------- <br /> Motion carried 4-0. <br /> S. Open Forum <br /> No one appeared for Open Forum. <br /> 6. Public Hearings <br /> There were no public hearings. <br /> 7.1 HRA Housing Rehabilitation Loan Program Update <br /> Ms. Othoudt presented the staff report. <br /> 7.2 Hillside Heights Apartments <br /> Ms. Othoudt presented the staff report. <br /> Chair Toth asked for clarification about there eing t ases to this project and the <br /> construction timeline. <br /> Dan Walsh,representing Community Housing Development Company, explained the <br /> building phases. He explained they will apply for low income tax credits this year,proceed <br /> with formal design and the local approval process in 2021, and construction at this time next <br /> year. He indicated the future phase will come after the first phase is completed, setting up <br /> the site to work towards two phases but designing the first phase to be a standalone project <br /> on its own should phase two not happen. <br /> Chair Toth asked if the second phase will be a standalone project also. <br /> Mr. Walsh stated they would construct a lot of the common amenities in the first phase, <br /> such as the playground, and the second phase will have the same amenities inside the second <br /> building with full service property management and maintenance staff, mirroring each other <br /> across the site. <br /> Commissioner Chuba asked which building would be built first of the two L-shaped <br /> buildings. <br /> Mr. Walsh indicated the building along Twin Lakes Road would be constructed first. <br /> Commissioner Chuba stated he was looking at some of the promotional offerings created by <br /> CHDC and felt they seem to promote the Northstar Commuter Rail Line as an important <br /> amenity to this project. <br /> Mr. Walsh stated the proximity of the project is important to the rail line as they are <br /> transportation-focused with the rail station within a half-mile walk,using access of the <br /> crosswalk and sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.