My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-03-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
08-03-2020
>
8.1. SR 08-03-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 8:24:45 AM
Creation date
7/31/2020 8:11:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DBOLTON <br />& MENK <br />Real People. Real Solutions. <br />MEMORANDUM <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: [7631433-2851 <br />Fax:(7631427-0833 <br />Bolton-Menk.com <br />Date: July 15, 2020 <br />To: Justin Femrite, P.E., Chief Engineer <br />City of Elk River <br />From: Jason W Cook, P.E. <br />Consultant Project Manager <br />Subject: Engineering Proposal for the Windsor Park 3' Addition - Sewer Extension — Design Phase <br />City of Isanti, MN <br />Bolton & Menk, Inc. is pleased to present this proposal for professional engineering services for the <br />design phase through bidding of the Windsor Park 3" Addition Sanitary Sewer Extension Project. We <br />have previously completed the Feasibility Report for this project and have a full understanding of what is <br />needed to deliver this project. <br />Our scope of work will include the following: <br />• Perform topographic survey and define right-of-way on <br />the south side of Ranch Road for 1.30 miles from the <br />existing manhole in Joplin St NW to the Great Northern <br />Trail forcemain connection. <br />• Design directional drilled sanitary sewer and forcemain <br />• Design of lift station and electrical supply <br />• Prepare construction plans and specifications <br />• Establish a cost estimate for the proposed improvements <br />• Administer the bidding process and process bids received <br />• Create assessment roll based on recommended low bidder <br />Design Phase <br />$10,400 <br />$14,700 <br />$12,800 <br />$14,000 <br />$1,000 <br />$1,000 <br />$1,000 <br />$54,900 <br />We propose to complete the total described scope of work for an hourly, not to exceed, fee of $54,900. <br />Should easements or land acquisition be required prior to bidding we would assist the City as needed for <br />an additional fee. <br />Thank you for the opportunity to present this proposal. Please contact me at (763) 200-2444 if you have <br />any questions or need additional information. <br />h:\elkr\$_city of elk river mn\windsor park plans & specs fee proposal.docx <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.