Laserfiche WebLink
<br /> <br />G. ESTIMATED BUDGET <br />ARTIST FEE <br />Two artists for all labor costs including design, documentation, fabrication and community engagement events. <br /> TOTAL: $20,000 <br /> <br />PROJECT MANAGEMENT AND SUPPORT: <br />Coordination of sculpture build, social media, press management including documentation, which take the form of <br />photographs and narratives posted on websites, instragram accounts, and facebook pages so that stakeholders can watch <br />the progress of the build. A published art book highlighting the process and finished work is also an option, at an <br />additional charge for printing. These high quality art books can be sold as a fundraiser, or used as documentation for <br />granting or educational purpouses. For more about this, ask to see the School of (Fish) book. <br /> <br />Also included in our projects is the participation of the artists in community engagement events, which are determined <br />by the scope of the project and identifiable community needs. These are often promotional events, but can also include <br />educational workshops presented in community venues. <br /> <br />On this project, we suggest a glass kilnforming workshop under tents at the site, or a Bronze Age metal casting. These <br />opportunities enable community members to understand the fabrication techniques behind the work and engender a <br />sense of ownership. Materials for these worksops are minimal. <br /> <br />PROJECT MANAGEMENT AND SUPPORT ARE INCLUDED IN THE ARTIST FEE. <br /> <br />PUBLIC ART MATERIALS <br />Architectural-grade kiln forming recycled glass $3,500 <br />Glass attachment findings $400 <br />20 Stainless Steel tube1 1/2 @10’ @$200 $2,100 <br />(including delivery to studio) <br />Three (3) bronze sheet 4’ x10’ $4,000 <br />Stainless Steel baseplate lasercut 1 ½” (W) $1,100 <br />Welding and supplies chargeback $1,610 <br />Fixings/threaded bar $220 <br />Patination chemicals and supplies $300 <br />MATERIALS ESTIMATE TOTAL: $13,230 <br /> <br />FABRICATION <br />Fabrication of curved steel bars (Linder’s ) $4,300 <br />3 weeks @ 40 hours for one general assistant ($20) $2,400 <br />Firing of glass triangles $330 <br />Insurance coverage $200 <br />FABRICATION SUB TOTAL: $7,230 <br /> <br />SOLAR LIGHTING BUDGET <br />Bespoke solar lighting system through local Elk River vendor <br />Architectural Grade <br />LED RGBW Directional Uplight Approximately $3,000 <br /> <br />TRANSPORTATION COSTS <br />Truck rental with lift gate $383 (including mileage) <br /> <br />INSTALLATION COSTS <br />It’s usually good practice to have the City help with the install, as they are to insure the work once they take possession. If <br />the City/commissioners lay the concrete pad according to local code and help set the work in place, then they can