My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. HRSR 07-06-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
07-06-2020
>
7.3. HRSR 07-06-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:49:30 AM
Creation date
7/2/2020 9:10:50 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
7/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Companies, Inc. <br />13792 247'^ Avenue — Zimmerman, MN 55398 <br />Phone (763) 274-0925 Fax 17631274-0928 <br />ROLL -OFFS ♦ SEPTIC SYSTEMS ♦ EXCAVATING <br />LANDSCAPING ♦ DEMOLITION <br />PROPOSAL <br />DATE <br />PROPOSAL # <br />5/28/2020 <br />5011 <br />BILL TO <br />City Of Elk River <br />13065 Orono Parkway <br />Elk River, Mn 55330 PROJECT <br />419 3rd Street, Elk River <br />ITEM <br />DESCRIPTION <br />QTY <br />RATE <br />TOTAL <br />PERMITS <br />PERMITS FEE <br />1.00 <br />150.00 <br />150.00 <br />DEMOLITION <br />Removal and proper disposal of foundation, detached <br />1.00 <br />4,500.00 <br />4,500.00 <br />garage and asphalt driveway. All applicable material will <br />be recycled. <br />DEMOLITION <br />Import material as needed to grade out lot with a <br />1.00 <br />1,500.00 <br />1,500.00 <br />maximum 3:1 slope in the area of the previous <br />foundation or home. All disturbed areas will be seeded. <br />Sewer/ Water Install <br />Excavation of a to cap sewer and water includes: <br />1.00 <br />7,200.00 <br />7,200.00 <br />- Permit from City of Elk River ($65 allowance) <br />- Dig 46 foot hole in blacktop up to a depth of 8 feet <br />above water main and cap % inch or 1 inch water <br />service to house. Hole will be backfilled and compacted. <br />- Blacktop will be removed offsite and recycled. <br />- Patch 46 foot blacktop <br />- Pushing patch from basement of house out to City <br />Main and insert of liner cap at service. <br />-Traffic Control <br />** Price Does NOT include any excavation in the road <br />to cap sanitary sewer line. <br />Job Notes <br />JOB NOTES: <br />0.00 <br />0.00 <br />* Above prices are based on doing this project in <br />conjunction with the other 6. <br />* All Prices above are valid for 30 days from date on <br />Proposal. <br />* City is responsible for having all utilities disconnected <br />and removed, all appliances and personal items need to <br />be removed from the house prior to demolition. <br />* The above prices do not include the following unless <br />otherwise listed above: <br />SIGNATURE & DATE <br />Subtotal <br />* Customer agrees that by signing this <br />proposal, it becomes a legal binding contract and all invoices will be paid <br />Sales <br />Tax (0.0%) <br />according to Steinbrecher Companies <br />Inc (SCI) terms. Should there be any circumstances where SCI cannot <br />complete the job, Customer still agrees <br />to pay for time and materials used up to termination ofjob. * Prices <br />above may include sales tax. If you are <br />Tax Exempt please complete and submit exemption form. * All prices <br />are <br />TOTAL <br />based on cash or check payment. Alternate <br />payment types may be charged additional 3% convenience fee. <br />CONTRACTOR PRE -LIEN NOTICE (Minn. Stat. 514.011 Subd. 1) <br />This Notice is to advise you of your rights under Minnesota law in connection with the improvement to your property. (a) Any person or company supplying labor or <br />materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. (b) Under Minnesota law, <br />you have the right to pay persons who supplied labor or materials for this improverj$ir �ctly and deduct this amount from our contract price, or withhold the amounts due <br />them from us until 120 days after completion of the improvement unless we give you t'l�en waiver signed by persons who supplied any labor or material for the improvement <br />and who gave you timely notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.