My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. HRSR 07-06-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
07-06-2020
>
7.3. HRSR 07-06-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:49:30 AM
Creation date
7/2/2020 9:10:50 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
7/6/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 Companies, Inc. <br />13792 24711 Avenue — Zimmerman, MN 55398 <br />Phone 1763) 274-0925 Fax 17631274-0928 <br />ROLL -OFFS SEPTIC SYSTEMS EXCAVATING <br />LANDSCAPING DEMOLITION <br />HRA Handout 06-01-2020 <br />PROPOSAL <br />DATE PROPOSAL # <br />5/28/2020 5015 <br />BILL TO <br />City Of Elk River <br />13065 Orono Parkway <br />PROJECT <br />Elk River, Mn 55330 <br />326 3rd Street, Elk River <br />ITEM <br />DESCRIPTION <br />QTY <br />RATE <br />TOTAL <br />PERMITS <br />PERMITS FEE <br />1.00 <br />150.00 <br />150.00 <br />DEMOLITION <br />Demolition, removal and proper disposal of house, <br />1.00 <br />12,375.00 <br />12,375.00 <br />detached building, and foundation. All applicable <br />material will be recycled. <br />DEMOLITION <br />Import material as needed to grade out lot with a <br />1.00 <br />1,785.00 <br />1,785.00 <br />maximum 3:1 slope in the area of the previous <br />foundation or home. All disturbed areas will be seeded. <br />Sewer/ Water Install <br />Excavation of a to cap sewer and water includes: <br />1.00 <br />7,200.00 <br />7,200.00 <br />- Permit from City of Elk River ($65 allowance) <br />- Dig 46 foot hole in blacktop up to a depth of 8 feet <br />above water main and cap's inch or 1 inch water <br />service to house. Hole will be backfilled and compacted. <br />- Blacktop will be removed offsite and recycled. <br />- Patch 46 foot blacktop <br />- Pushing patch from basement of house out to City <br />Main and insert of liner cap at service. <br />- Traffic Control <br />** Price Does NOT include any excavation in the road <br />to cap sanitary sewer line. <br />SIGNATURE DATE <br />Subtotal <br />Sales Tax (0.0%) <br />* Customer agrees that bysigning this proposal, it becomes a legal binding contract and all invoices will be paid <br />according to Steinbrecher Companies Inc (SCI) terms. Should there be any circumstances where SCI cannot <br />complete thejob, Customer still agrees to payfor time and materials used up to termination of job.' Prices <br />above may include sales tax. If you are Tax Exempt please complete and submit exemption form. * All prices are <br />based on cash or check pavment. Alternate pavment types may be charged additional 3% convenience fee. <br />CONTRACTOR PREF IJEN NOTICE (Minn. Stat. 514.011 Subd. 1) <br />This Notice is to advise you of your rights under Minnesota law in connection with the improvement to your property. (a) Any person or company supplying labor or <br />materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. (b) Under Minnesota law, <br />you have the right to pay persons who supplied labor or materials for this improver �irPlctly and deduct this amount from our contract price, or withhold the amounts due <br />them from us until 120 days after completion of the improvement unless we give you ten waiver signed by persons who supplied any labor or material for the improvement <br />and who gave you timely notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.