Laserfiche WebLink
Main and Gates TIF Analysis <br />Replacement Cost Report <br />RSM Mans darn <br />hole BORGLi111iM' <br />Square Foot Cost Estimate Report Date: <br />5/12/2020 <br />Estimate Name: <br />406 Main Street NW <br />Building Type: <br />Office, 1 Story with Vinyl Clapboard / Wood Frame <br />Location: <br />ELK RIVER, MN <br />Story Count: <br />14 vas'` <br />i;'• ; <br />Story Height (L.F.): <br />10 <br />n-. <br />Floor Area (S.F.): <br />2400 <br />Labor Type: <br />OPIN <br />-3 <br />Basement Included: <br />Yes <br />Data Release: <br />Year 2019 Costs are derived from a building model with <br />basic components. <br />Cost Per Square Foot: <br />$259.21 Scope differences and market <br />conditions can <br />cause costs to vary <br />significantly. <br />Building Cost: <br />$622,110.38 <br />of Total Cost Per S.F. <br />Cost <br />Substructure <br />� <br />= <br />A1010 <br />Standard Foundations <br />$7.78 <br />$18,669.63 <br />A10101102700 <br />Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing <br />$3.93 <br />$9,431.43 <br />capacity 6 KSF, 12" deep x 24" wide <br />A10102107410 <br />Spread footings, 3000 PSI concrete, load 100K, soil bearing capacity 6 <br />$3.85 <br />$9,238.20 <br />KSF, 4' - 6" square x 15" deep <br />A1030 <br />Slab on Grade <br />$5.73 <br />$13,743.17 <br />A10301202240 <br />Slab on grade, 4" thick, non industrial, reinforced <br />$5.73 <br />$13,743.17 <br />A2010 <br />Basement Excavation <br />$3.97 <br />$9,524.69 <br />A20101104620 <br />Excavate and fill, 10,000 SF, 8' deep, sand, gravel, or common earth, <br />$3.97 <br />$9,524.69 <br />on site storage <br />A2020 <br />Basement Walls <br />$24.53 <br />$58,862.27 <br />A20201107260 <br />Foundation wall, CIP, 12' wall height, pumped, .444 CY/LF, 21.59 PLF, <br />$24.53 <br />$58,862.27 <br />12" thick <br />B1010 <br />Floor Construction <br />$28.23 <br />$67,749.18 <br />B10102030860 <br />Cast -in -place concrete column, 12" square, tied, 200K load, 12' story <br />$8.69 <br />$20,858.21 <br />height, 142 Ibs/LF, 4000PSI <br />B10102103450 <br />Wood column, 8" x 8", 20' x 20' bay, 10' unsupported height, 133 <br />$0.45 <br />$1,079.38 <br />BF/MSF, 160 PSF total allowable load <br />B10102221720 <br />Flat slab, concrete, with drop panels, 6" slab/2.5" panel, 12" column, <br />$14.26 <br />$34,213.68 <br />15'x15' bay, 75 PSF superimposed load, 153 PSF total load <br />B10107203700 <br />Fireproofing, gypsum board, fire rated, 2 layer, 1" thick, 14" steel <br />$4.83 <br />$11,597.91 <br />column, 3 hour rating, 22 PLF <br />B1020 <br />Roof Construction <br />$7.46 <br />$17,895.36 <br />B10201027100 <br />Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span <br />$7.46 <br />$17,895.36 <br />B2010 <br />Exterior Walls <br />$13.05 <br />$31,310.03 <br />B20101484850 <br />Wood siding, 2"x6" studs 16"OC, insulated wall, 8" plain vinyl siding <br />$11.44 <br />$27,462.71 <br />Main and Gates TIF Analysis <br />Replacement Cost Report <br />LHB Project No. 190549.01 <br />Page 1 of 3 406 Main St NW <br />— Commercial Building <br />