Laserfiche WebLink
Main and Gates TIF Analysis <br />Replacement Cost Report <br />RSMoa n& data <br />WAMMM11111101APIA <br />Estimate Name: <br />Building Type: <br />Location: <br />Story Count: <br />Story Height (L.F.): <br />Floor Area (S.F.): <br />Labor Type: <br />Basement Included: <br />Data Release: <br />Cost Per Square Foot: <br />Building Cost: <br />Square Foot Cost Estimate Report <br />430 Main St NW <br />Office, 1 Story with Vinyl Clapboard / Wood Frame <br />ELK RIVER, MN <br />1 <br />8 <br />1096 <br />OPN <br />Yes <br />Year2019 <br />$256.09 <br />$280,670.39 <br />Date: 8/20/2019 <br />,a x'A <br />Costs are derived from a building model with basic components. <br />Scope differences and market conditions can cause costs to vary significantly. <br />of Total Cost Per S.F. <br />Cost <br />Substructure <br />A1010 <br />Standard Foundations <br />$8.64 <br />$9,465.54 <br />A10101102700 <br />Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity <br />$4.92 <br />$5,389.39 <br />6 KSF, 12" deep x 24" wide <br />A10102107410 <br />Spread footings, 3000 PSI concrete, load 100K, soil bearing capacity 6 <br />$3.72 <br />$4,076.15 <br />KSF, 4' - 6" square x 15" deep <br />A1030 <br />Slab on Grade <br />$5.73 <br />$6,276.05 <br />A10301202240 <br />Slab on grade, 4" thick, non industrial, reinforced <br />$5.73 <br />$6,276.05 <br />A2010 <br />Basement Excavation <br />$3.97 <br />$4,349.61 <br />A20101104620 <br />Excavate and fill, 10,000 SF, 8' deep, sand, gravel, or common earth, <br />$3.97 <br />$4,349.61 <br />on site storage <br />A2020 <br />Basement Walls <br />$30.69 <br />$33,635.58 <br />A20201107260 <br />Foundation wall, CIP, 12' wall height, pumped, .444 CY/LF, 21.59 PLF, <br />$30.69 <br />$33,635.58 <br />12" thick <br />B1010 <br />Floor Construction <br />$29.15 <br />$31,947.76 <br />B10102030860 <br />Cast -in -place concrete column, 12" square, tied, 200K load, 12' story <br />$8.40 <br />$9,203.22 <br />height, 142 Ibs/LF, 4000PSI <br />B10102103450 <br />Wood column, 8" x 8", 20' x 20' bay, 10' unsupported height, 133 <br />$0.45 <br />$492.92 <br />BF/MSF, 160 PSF total allowable load <br />B10102221720 <br />Flat slab, concrete, with drop panels, 6" slab/2.5" panel, 12" column, <br />$14.26 <br />$15,624.25 <br />15'x15' bay, 75 PSF superimposed load, 153 PSF total load <br />B10107203700 <br />Fireproofing, gypsum board, fire rated, 2 layer, 1" thick, 14" steel <br />$6.05 <br />$6,627.38 <br />column, 3 hour rating, 22 PLF <br />B1020 <br />Roof Construction <br />$7.46 <br />$8,172.21 <br />B10201027100 <br />Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span <br />$7.46 <br />$8,172.21 <br />B2010 <br />Exterior Walls <br />$13.06 <br />$14,311.32 <br />B20101484850 <br />Wood siding, 2"x6" studs 16"OC, insulated wall, 8" plain vinyl siding <br />$11.45 <br />$12,554.38 <br />B20101907600 <br />Insulation, fiberglass batts, 6" thick, R19 <br />$1.60 <br />$1,756.94 <br />B2020 <br />Exterior Windows <br />$6.13 <br />$6,713.36 <br />Main and Gates TIF Analysis Replacement Cost Report <br />LHB Project No. 190549 Page 1 of 3 430 Main St NW - Fomer Office <br />