My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.25.2020 Public Art Subcommittee Meeting Packet
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA City Beautification & Public Art Committee
>
EDA Public Art Subcommittee - 2020 & 2021
>
PACKETS
>
2020
>
06-25-2020
>
6.25.2020 Public Art Subcommittee Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2020 4:43:00 PM
Creation date
6/24/2020 4:42:50 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
6/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ranking Criteria <br /> <br />1.Public Art Message – a maximum of 20 points __________ <br />How the artist’s project fits within the theme of Energy City, Powered by Nature, or the <br />history of transportation in Elk River. <br />1.Aesthetics – a maximum of 30 points. _________ <br />How the artist’s project fits within the following parameters. <br />a.The work has visual appeal <br />b.The work is a unified, balanced, and harmonious whole <br />c.The design, medium(s), and composition enrich the central idea of the work. <br />d.The work evokes aspects of the themes (Transportation, Powered by Nature, and/or <br />Energy City) <br />e.The work enhances the chosen site. <br /> <br />2.Memorable and Impactful – a maximum of 20 points _________ <br /> <br />3.Related Understanding – a maximum of 10 points _________ <br />f.Can the work be built and installed as proposed? <br />g.Suitability of the artwork for outdoor display, including its maintenance and conservation <br />requirements. <br />h.Relationship of the artwork to the site and the host community, especially how it serves <br />to activate or enhance economic development. <br />i.Appropriateness of the scale of the artwork. <br />j.How closely the proposed artwork meets the vision set out in the RFP and the Elk River <br />Public Arts Plan. <br /> <br />4.Schedule - a maximum of 10 points ________ <br />a.How well the proposed schedule from project initiation to final completion (including key <br />tasks within each phase, key milestones and approximate dates, and deliverables) works <br />for the city and EDA. <br />b.Evidence of the artist’s ability to work collaboratively and successfully complete the <br />Project on time and on budget. <br /> <br />5.Cost- a maximum of 10 points ________ <br />a.What are the city and the EDA’s costs in the short and long term? <br />(1)Artists’ materials <br />(2)Transportation costs <br />(3)Installation costs <br />(4)Future maintenance costs <br />(5)Any other costs or charges <br />TOTAL Points_________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.