Laserfiche WebLink
Approximately 600 feet of six-inch cast-iron water main pipe, formerly located between <br />School Street and the new Multipurpose Facility, has been replaced with new eight-inch <br />ductile-iron pipe. This will provide increased reliability and improved water flow for the <br />water system. The workwas done in cooperation with the school district under the high <br />school parking lot rehabilitation project. <br />ATTACHMENTS: <br />May 2020 Pumping by Well <br />______________________________________________________________________________ <br />Page 2 of 2 <br />152 <br />