My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 06-01-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
06-01-2020
>
7.2 SR 06-01-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:46:01 PM
Creation date
5/29/2020 9:20:50 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spack Solutions <br />4 of 6 Line Avenue Residential Development <br />Traffic Assessment <br />When Line Avenue is cut north of the site access, it is anticipated the distribution pattern would <br />be: <br />• 10% of the generated traffic to/from the west on 3d Street <br />• 20% of the generated traffic to/from the east on 1815Y Avenue <br />• 20% of the generated traffic to/from the south on Zane Street <br />• 50% of the generated traffic to/from the west on Main Street <br />In this scenario 100% of the site traffic would go to/from the south at the site access. <br />The new site trips from the residential development are shown in Figure 1 for the existing Line <br />Avenue layout and Figure 2 for the proposed future Line Avenue Layout. <br />Figure 1— New Site Trips — Existing Line Avenue Layout <br />AM Peak Hour <br />+ 00 rafto\ <br />PM Peak Hour <br />n�� <br />Daily <br />
The URL can be used to link to this page
Your browser does not support the video tag.