Laserfiche WebLink
• Acquisition of easements and property. <br />• Use of ferric chloride, aluminum sulfate, or other chemicals to precipitate phosphorus. <br />• Dredging of harbors, lakes, ditches, constructed wetlands, and existing sedimentation basins. <br />How do I apply for CWP loan funding? <br />For more information on how to apply for CWP loan funding, visit the MPCA's contract, grant and loan <br />opportunities webpage at https://www.pca.state.mn.us/water/clean-water-partnership-loans <br />What are the interest rates? <br />The current interest rate for loans to local governments is 0%. Interest rates available to private parties from <br />local governments for second -tier loans must be at or below 1.5%. <br />As of December 2018, 318 projects have constructed $56.3M of BMPs: <br />$45.2M <br />Individual septic treatment systems <br />$4.OM <br />Feedlots <br />$1.8M <br />Permanent structures <br />$1.6M <br />In -lake chemical treatments <br />$.8M <br />Equipment <br />$2.5M <br />Land use practices/erosion control activities <br />$AM <br />Administration/education and training <br />Page 2 of 2 I January 2019 1 wq-cwp1-18 <br />