Laserfiche WebLink
From: Deana McLean (see pictures below) <br />Sent: Thursday, May 28, 2020 3:09 PM <br />To: Othoudt, Amanda <AOthoudt@ElkRiverMN.gov> <br />Subject: [EXTERNAL] Salon On Main <br />Good Afternoon Amanda, <br />Thank you for talking with me today for a few minutes. I would like to get all the paperwork for the EDA <br />Loan from the City also. And the information or paperwork for the Forgivable tax information too. <br />I appreciate your help and the counsel's for helping me figure out the best solution so I can keep <br />working at the Salon in our lower level and also be able to get my construction completed this month of <br />June hopefully. <br />My thoughts is that now I will have my contractors (Kiser Construction) park the dump trailer in one of <br />my spot in front of the salon daily when they are working. On Friday's the trailer will be removed from <br />the spot for the weekends. But during the week it will need to be in one of my spots. Along with one <br />contractor truck also. <br />I will have two Orange cones with signage that say KISER Consttruction/Salon On Main to make sure <br />those two parking spots are not taken by anyone else during the weeks. But as mentioned the two <br />spots will be open Friday after 5:00 pm thru Sunday night. <br />Monday -Friday till 5:00 pm the trailer will need to sit there for all the construction garbage to go in. As <br />we are now about to start all the sheet rocking. By doing this I will also tell my contractors not to park <br />in the back lot so that this space is open for customers. As I will also have clients starting on Monday at <br />the Salon On Main. <br />I will have them park across the street or where ever else they can find a spot other than in front of all <br />the businesses and buildings that have customers. <br />I have a POD in the back that can not be moved. All my items for the inside are in there and we still <br />need some things out of there off and on. <br />The three back sides also need repairing as we know and are working with Signature Stucco to get those <br />repaired. I have spoke to the stucco company and we may be able to wait till September to do the back <br />three walls if that will help with everything. But we need to for sure get this done no later than mid <br />September. I realize the Brewery would like to have there patio area which is great but in September <br />than I would need for us to be able to access our side of the building there to repair and stucco that side <br />of our building. <br />I hope this will be considered and that you all understand I have not had ANY INCOME since end of <br />MARCH at all just like I mentioned in my prior email. I need to get my building completed and my staff <br />back in and working to have this happen. They want to be back in there spaces. <br />Thank you, <br />Deana McLean <br />Salon On Main <br />763-458-7222 <br />