Laserfiche WebLink
<br />I. Introduction <br /> <br />The proposed Northstar Corridor Rail Project (Project) will provide commuter <br />rail service along a 40-mile corridor from Downtown Minneapolis to Big Lake, <br />Minnesota parallel to Trunk Highways 47 and 10. It will use existing rail tracks <br />owned by the Burlington Northern Santa Fe Railway Company (BNSF) and <br />include 6 stations. The commuter line is expected to carry 5,600 passengers per <br />day by the year 2025. The rail line will have inter-modal connections to bus <br />transit and to the Hiawatha Light Rail Transit (LRT) line. The Northstar <br />connection to LRT consists of a four-block extension on the north end of the <br />Hiawatha LR T to reach the Downtown Minneapolis commuter rail station. <br />With the exception of the Downtown Minneapolis station, all of the stations will <br />have park and ride facilities. <br /> <br />The Minnesota Department of Transportation (Mn/DOT), the grantee, is <br />working closely with its partners, the Northstar Corridor Development <br />Authority (NCDA) and the Metropolitan Council, to deliver the Northstar <br />Project. <br /> <br />Since the last written report to the Federal Transit Administration (FT A), dated <br />May 2005, the following occurred: <br /> <br />. Project staffing changes <br />. A series of decisions have been made to enable design to proceed <br />. Second coordination meeting on Twins baseball stadium <br />. FT A is conducting a procurement system review <br />. The Project is submitting a series of materials to FTA to seek a <br />"Recommended" rating and approval for entry into final design <br />. A design agreement was reached with BNSF <br />. The Project selected a firm for risk management services <br />· Community and public meetings have been held regarding Northstar <br /> <br />II. Project Milestones <br /> <br />The following table lists the major milestones in the development and ongoing <br />implementation of the Northstar project. <br /> <br />Northstar Corridor Monthly Report <br />June 17,2005 <br /> <br />3 <br /> <br />,t~~ <br />-';(IIDBTHSTAR <br />alllllllD IUIll <br />