My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 07-18-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
07/18/2005
>
6.5. SR 07-18-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 3:30:09 PM
Creation date
7/15/2005 11:16:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. Introduction <br /> <br />The proposed Northstar Corridor Rail Project (Project) will provide commuter <br />rail service along a 40-mile corridor from Downtown Minneapolis to Big Lake, <br />Minnesota parallel to Trunk Highways 47 and 10. It will use existing rail tracks <br />owned by the Burlington Northern Santa Fe Railway Company (BNSF) and <br />include 6 stations. The commuter line is expected to carry 5,600 passengers per <br />day by the year 2025. The rail line will have inter-modal connections to bus <br />transit and to the Hiawatha Light Rail Transit (LRT) line. The Northstar <br />connection to LRT consists of a four-block extension on the north end of the <br />Hiawatha LR T to reach the Downtown Minneapolis commuter rail station. <br />With the exception of the Downtown Minneapolis station, all of the stations will <br />have park and ride facilities. <br /> <br />The Minnesota Department of Transportation (Mn/DOT), the grantee, is <br />working closely with its partners, the Northstar Corridor Development <br />Authority (NCDA) and the Metropolitan Council, to deliver the Northstar <br />Project. <br /> <br />Since the last written report to the Federal Transit Administration (FT A), dated <br />May 2005, the following occurred: <br /> <br />. Project staffing changes <br />. A series of decisions have been made to enable design to proceed <br />. Second coordination meeting on Twins baseball stadium <br />. FT A is conducting a procurement system review <br />. The Project is submitting a series of materials to FTA to seek a <br />"Recommended" rating and approval for entry into final design <br />. A design agreement was reached with BNSF <br />. The Project selected a firm for risk management services <br />· Community and public meetings have been held regarding Northstar <br /> <br />II. Project Milestones <br /> <br />The following table lists the major milestones in the development and ongoing <br />implementation of the Northstar project. <br /> <br />Northstar Corridor Monthly Report <br />June 17,2005 <br /> <br />3 <br /> <br />,t~~ <br />-';(IIDBTHSTAR <br />alllllllD IUIll <br />
The URL can be used to link to this page
Your browser does not support the video tag.