My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 05-18-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
05-18-2020
>
9.1. SR 05-18-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 10:05:46 AM
Creation date
5/15/2020 10:03:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/18/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following are the preliminary proposed assessment rates based on the City's assessment <br />policy. <br />• A preliminary assessment roll has been included in Appendix E. <br />VIII. CONSTRUCTION PHASING <br />The existing drainfield system will need to remain in service until the lift station is ready to go <br />online and the supporting infrastructure is in place. The Windsor Park lift station can not be <br />operated until construction is completed on the Great Northern Trail forcemain. <br />Construction of the proposed improvements can be completed in one phase. The project can be <br />completed under one contract or multiple contracts as the City Council determines. <br />IX. FEASIBILITY AND RECOMMENDATION <br />Based on the findings presented in this report, the proposed improvements are cost effective, <br />necessary, and feasible from an engineering perspective. Bolton & Menk, Inc. recommends that, if <br />these improvements are determined to be financially feasible through the assessment process, the <br />City Council approve this report, call for a public hearing, and authorize the preparation of final <br />plans and specifications. <br />It is not recommened for the City to increase the depth of the proposed lift station or enlarge the lift <br />station pump capacity beyond what is required to provide service to Windsor Park 3,d Addition as <br />that additional cost would not result in additional benefit to the City. <br />Prepared by: Bolton & Menk, Inc. <br />Windsor Park 3,d Addition — Sewer Connection I R16.120038 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.